1) pile cap beam
桩顶联系梁
2) parallel connection tip girder
并联顶梁
1.
So the parallel connection tip girder support is chosen and applied according to the characteristics of the coal mine.
该矿根据煤层赋存特点,选用并联顶梁支架,通过近半年的试采,取得了良好的效果。
3) connecting beam between foundation
高桩系梁
4) collar beam roof
系梁屋顶
5) Couplings-among-piles
桩间联系
6) joining balk
联系木梁
补充资料:顶梁
1.头顶。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条