1) master plan
总平面图;总规划
2) general layout
总图规划
1.
By analysis of the presented and proposed railways in Fuling and investigation of the all conditions that Fuli Railway pass through Fuling, a long-dated general layout scheme and the earlier and fature rail -joint scheme of rail joint between Fuli Railway and Yuhuai Railway in Fuling Station are presented.
分析重庆市涪陵地区既有铁路现状和拟建铁路,研究涪陵至利川铁路引入涪陵地区的各种条件,提出涪陵至利川铁路在渝怀线涪陵车站接轨的远期总图规划方案及初、近期接轨方案。
2.
In general layout,we often need to make the alternation of plane diagrams,for this reason,the writer has demonstrated the matrix representaion and its inference process of these diagrams which can be used as reference for general layout designers.
在总图规划中 ,常常需要做平面图形的变换 ,针对这一工作 ,阐述了这些图形变换的矩阵表示及推导过程 ,可供从事总图规划的设计人员参考借
3) master plan
规划总图
6) general plot plan
总图,总平面图
补充资料:城市总体规划与国土规划、区域规划的关系
国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条