1) emission limit
排放极限
2) emission control deadline
排放控制极限
3) limited drainage
限量排放
1.
In aspects of often used reduction coefficient of lining external water pressure in tunnel water inflow estimation and hydrotechnical tunnel,this paper analyzes lining external water pressure calculation of rich water segment of tunnel under "limited drainage" via simplified model,and discusses the implementation of "limited drainage" so to conclude some useful conclusions for design reference.
从隧道涌水量预测、水工隧洞求解衬砌外水压力常用的折减系数法等方面,通过简化模型分析隧道富水段在“限量排放”下的衬砌外水压力计算方法,并探讨“限量排放”的实施问题,得出一些有益的结论供设计参考。
6) emission limit
排放限度
补充资料:排放
1.排泄放出。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条