1) ore preparation
矿石准备
2) preparation of ore
矿石准备<冶>
3) preparation ore quantity
准备矿量
1.
The calculation of production preparation ore quantity is following:developing ore quantity is decided by loading ore quantity of draw wheel slopes and mining preparation,stoping ore quantity are calculated by ore block productive capacity of one year and half year.
王村铝土矿采用长壁式陷落法采矿,生产准备矿量的计算为开拓矿量由采区放矿轮子坡担负矿量确定;采准、回采矿量以矿块一年和半年的生产量计算。
4) mine prospecting reserve
探矿准备金
5) Production ore reserve
生产准备矿量
6) Uranium ore calibration standard
铀矿石校准模型
补充资料:设备安装前的准备工作——吊装用机具的准备
设备安装前的准备工作——吊装用机具的准备 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条