1) initiating structure consideration
主动结构-体贴
2) initiating structure consideration
主动结构?体贴
3) main body structure
主体结构
1.
This paper puts forward the designing method of diaphragm wall being used as main body structure,including the disposing manner,designing construction joint and structure joint and the calculating method of bearing capacity of diaphragm wall.
从地下连续墙作为主体承重结构 (两墙合一 )的角度出发 ,介绍了地下连续墙作为主体结构的设计方法 ,包括地下连续墙作为主体结构的布置方式、地下连续墙施工接头和结构接头的设计 ,以及地下连续墙的垂直承载力的计算方法。
4) agent structure
主体结构
1.
11 German governor mansion as research object,the article analyzes and discusses it from construction site selection,building plane,building vertical plane,and agent structure,and evaluates its status and historical value in modern history of Qingdao.
以德国十一号官邸旧址建筑为研究对象,分别从建筑选址、建筑平面、建筑立面和建筑主体结构几方面对其进行了详细论述,并进一步评价了其在青岛近代史上的地位和历史价值。
2.
An agent structure of enormous scene of fire is surveyed in the burning area of the fire.
对一起特大火灾现场主体结构进行了调查。
3.
With construction of sub-river(sub-sea)shield tunnel,it is significant for structural stability to feel out that stressed characteristics of Tunnel agent structure under high water pressure.
随着江(海)底盾构隧道的建设,探明高水压下隧道主体结构的受力特征对于结构的稳定性具有重要意义。
5) main structure
主体结构
1.
Vibration of cable net made of carbon fiber cables under excitation of main structure displacement
主体结构位移激励下碳纤维索网的振动
2.
Optimization of construction scheme for main structures of a thermal power plant
某火电厂主体结构施工方案优化
3.
This paper expounds the process and organization of main structure acceptance of constructional engineering,and probes into the key control points in the process of main structure acceptance.
阐述了建筑工程主体结构验收的程序和组织,探讨了在主体结构验收过程中的控制要点。
6) major structure
主体结构
1.
The construction method of large formwork loop wheel machine in major structure of railway station;
地铁车站主体结构大模板台车施工工法
2.
0 m and then analysed in detail the safty of the sparsely arranged scheme and its effect on the major structure.
0 m的疏排人工挖孔桩方案,并且详细分析了疏桩基坑的安全性以及对主体结构的影响。
3.
From the perspectives of intrinsic safety and incident prevention mechanism,and combining the practice of safety supervision and management in Xi\'an subway,the construction idea of constructing accessory structure first and constructing major structure later in railway station was put forward,as well as the safety management idea of "seize the big,check the small,enhance the safety".
从本质安全和事故预防机理角度出发,结合在西安地铁安全监督管理的实践,提出了地铁车站先修建附属结构后修建主体结构的建设理念,以及"抓大、查小、促安全"的安全管理理念,这是"安全第一,预防为主,综合治理"的方针在西安地铁建设过程中的具体化,使西安地铁的安全监督管理工作步入科学、健康发展的良性轨道。
补充资料:主动
①不靠外力促进而自动:主动关心同学。②能够由自己把握:争取主动。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条