1) swash bar
冲流沙坝
2) chute bar
急流沙坝
3) meander bar
曲流沙坝
4) sediment discharge bottom outlet at right side
右冲沙底孔坝段
1.
In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section,the blasting method was used in Jinghong power station.
云南景洪水电站,为保证右冲沙底孔坝段汛期稳定和厂房坝段能正常开挖实施的厂房坝段爆破开挖控制工作是成功和行之有效的,特别是控制爆破的成功为景洪电站优质、快速施工奠定了坚实的基础。
6) flushing flow rate
冲沙流量
1.
To demonstrate whether the arrangement of flushing establishment is reasonable and the flushing effect of different flushing flow rate and so on,the flushing experiment was made.
为论证冲沙设施布置合理与否及不同大小冲沙流量的冲沙效果等,在完成地下电厂方案的长系列水文年(31+2a至70+6a)淤积试验后对各种年型及冲沙引用流量进行了冲沙试验。