1) shoal-retreat massif
![点击朗读](/dictall/images/read.gif)
后退浅滩砂体
2) concave flood plain sand body
![点击朗读](/dictall/images/read.gif)
边滩砂体
1.
By converting these geophysical parameters sections into sedimentary facies sections,sedimentary micro facies can be used to forecast the distributing of concave flood plain sand body.
将这些参数剖面转换成沉积相剖面,可用沉积微相定量预测控制边滩砂体的分布,这对砂体十分发育的,以河流相沉积为主的工区,有重要的研究意义和实用价值。
3) shoal-bar sand body
![点击朗读](/dictall/images/read.gif)
滩坝砂体
1.
Sequence stratigraphy framework is established for sub-Es4up of Dongying Depression according to the sedimentary characteristics of lacustrine shoal-bar sand body, based on sequence stratigraphy and comprehensive analysis of seismic, logging and coring data.
针对东营凹陷沙四上亚段滨浅湖滩坝砂体沉积特征,根据层序地层学理论,在综合分析地震、测井、岩心等资料的基础上,采用地震层序、声波时差和测井曲线叠合等方法进行层序界面识别,建立了东营凹陷沙四上亚段层序地层格架,将沙四上亚段划分为一个三级层序,并根据层序内低位体系域、湖侵体系域及高位体系域发育情况,细分为7个准层序组。
4) near lake-shore sandy bar
![点击朗读](/dictall/images/read.gif)
滨浅湖砂质滩坝
6) secche
![点击朗读](/dictall/images/read.gif)
浅滩浅滩
补充资料:普卡基湖坝
普卡基湖坝 |
Pukaki Lake Control Dam |
概 述 |
普卡基湖坝建在新西兰坎特伯里区、普卡基(Pukaki)河上,在蒂马鲁市附近。工程目的是发电。大坝建在冰川成因的砾石、砂和粉砂层上,为碾压土坝,最大坝高61m,坝顶长823m,大坝上、下游坝壳采用冰水砾石建成,中央心墙和上游铺盖则采用取自终碛的碾压粉砂砾石。通过上游铺盖和下游排水井阻截地下渗流。大坝体积460万m3。在大坝以西约300m处建有1座单独的副坝,为普卡基渠引水建筑物,副坝为碾压土坝,坝高32m,坝顶长640m,体积125万m3。横剖面与主坝类似。普卡基湖面积174km2,最高运行水位530.7m,水位变幅14m,总库容63亿m3。渠道进水口为170m长的钢筋混凝土箱形涵洞结构,分3孔,每孔宽6.1m,高9.1m。涵洞上游侧设有闸门室,安装3扇5.9m×6.1m(高×宽)的弧形闸门来调节渠道的流量,进水口最大流量为560m3/s。普卡基渠全长12km,最终与怀奥渠汇合。陡槽式溢洪道位于大坝左坝肩处,设4扇弧形堰顶闸门,闸门尺寸为13.0m×10.7m(高×宽),陡槽长400m,下游设消力池,溢洪道泄流量3398m3/s。导流涵洞位于右岸,是座椭圆形断面的钢筋混凝土结构,高10m,宽6m,长360m。涵洞上游侧设有闸门室,安装1扇9.0m×6.0m(高×宽)的弧形闸门。闸门用于调节湖水位上升期间的流量,相当于1个泄水底孔。工作水头57m,泄流能力570m3/s。大坝于1976建成。 |