2) quantitative risk analysis
定量风险分析
1.
A discussion on the criteria for quantitative risk analysis of sour gas wells
含硫气井定量风险分析技术标准探讨
2.
We described the nature of terrorism, quantitative risk analysis is adopted to evaluate the risk of terrorism attack.
本文对恐怖主义属性进行了描述,采用定量风险分析方法对电力系统遭受恐怖袭击的风险进行评估。
3) quantitative risk assessment
定量风险分析
1.
reviewed the progress of quantitative risk assessment, proposed the methodology to assessment and quantita- tive the risk of terrorism attack.
本文回顾了定量风险分析的发展过程,提出了对恐怖主义风险进行评估、定量的方法。
2.
The quantitative risk assessment for natural gas wells with hydrogen sulfide is a necessary and impending requirement.
结果表明,由于地形条件的影响,在气井周边不同方向的个人风险水平差异很大,可接受风险水平上限值等值线距井口的距离在不同方位上相差可达1000m,在对气井进行定量风险分析时必须充分加以考虑。
3.
So it must be fully considered when performing the consequence simulation and quantitative risk assessment of gas wells.
结果表明,含硫气井所处的地形条件对硫化氢浓度场及受体致死概率计算结果影响很大:所选计算井其东、西、北三面地形平坦,以浅丘为主,南侧背靠海拔1 230 m的山峰,受井口南侧山峰的影响,北风下井口附近区域毒性负荷及受体致死概率最高,次高峰值处距井口约1 000 m,因此在对气井进行事故后果模拟及定量风险分析时必须充分考虑地形的影响。
4) quantitative risk assessment
定量风险评价
1.
Method for determinating probabilities of leaks in quantitative risk assessment;
定量风险评价中泄漏概率的确定方法探讨
2.
Method of installation selection and its application in quantitative risk assessment;
设备选择数方法及其在定量风险评价中的应用
3.
The present paper gives the general indicators and procedure for quantitative risk assessment.
本文给出了定量风险评价的评价指标和一般程序。
5) quantitative risk assessment
定量风险评估
1.
Integrated with quantitative risk assessment of LNG receiver, this paper introduces the conceptions, main procedures and implementation process of quantitative risk assessment.
介绍了定量风险评估的概念及其主要步骤,结合LNG接收站定量风险评估实例,阐述了定量风险评估技术的实施过程。
2.
The potential risk factors are found by the way of risk identification; the risk values of risk events are evaluated by making use of the quantitative risk assessment method;all operation risk events are arranged in order according to the risk values,and some control measures are given.
利用风险辨识的方法找出潜在的风险因素,然后运用定量风险评估技术对操作风险事件进行定量计算,并对风险事件按照风险值大小进行排序,给出控制措施。
3.
This paper introduces the definition,process,risk value and risk standard of the quantitative risk assessment.
结合埕北12C平台进行了定量风险评估,并提出了风险降低措施,为平台的安全生产提供了重要的指导意义。
6) semi-quantitative risk assessment
半定量风险评价
1.
Kent Muhlbauer is a method of semi-quantitative risk assessment.
kent Muhlbauer)管道风险评价法是一种半定量风险评价法,但是该方法在我国还处在起步阶段,其理论基础和应用技术都很不完善。
2.
Kent Muhlbauer is a method of the semi-quantitative risk assessment.
肯特管道风险评价法是一种半定量风险评价法,这种方法在我国的应用还处在起步阶段,其理论基础和应用技术都很不完善。
补充资料:定量风险评价
定量风险评价
[定量风险评价】“定量分析”。又称“定量分析”。参见
说明:补充资料仅用于学习参考,请勿用于其它任何用途。