1)  operating hours
运转小时
2)  service hours
运转小时
3)  running hours
工作(运转)小时数
4)  running hours indicator
运转小时指示器
5)  service hours counter
运转小时计数器
6)  engine hour meter
内燃机运转小时计
7)  engine hour meter
发动机运转小时计
8)  operation
运转
1.
The necessity of adjusting well ventilation system according to underground actual circumstance during many fan united operation period is introduced,which not only can develop the ability of each main fan,improve operation efficiency and effective air quantity,but also can make underground ventilation system further reasonable,stable,create a good safe and economic benefit.
介绍了矿井在多台主扇联合运转时期根据井下的实际情况及时调整通风系统的必要。
2.
The paper introduces principle of the HPY18-10/7-K air compressor, analyses failure reason points out matters paid out in the operation and gives out methods of removing the failure.
介绍了HPY18-10/7-K型矿用移动滑片空气压缩机的工作原理,分析设备故障原因,指出操作运转中的注意事项,给出排除设备故障的办法。
3.
The paper expounds how to make the effective operation of "9+2" human resource integrating system through accelerating regional talent development, service integration and industrialization.
本文以人力资源的整合理念为导向,从人力资源整合的必要性及可行性入手,阐述了如何通过加快区域人才开发与服务一体化、产业化来促进“9+2”人力资源整合体系的有效运转,并就整合体系运转过程中存在的一些已经解决和尚未解决的问题进行探讨。
9)  translocation
运转
1.
The absorption and translocation of nitrogen and their relationship to grain protein content in different winter wheat cultivars;
不同冬小麦品种氮素吸收运转特性及其与子粒蛋白质含量的关系
2.
Effects of Irrigation Amount on Absorbability and Translocation of Nitrogen in Winter Wheat;
灌溉量对小麦氮素吸收和运转的影响
3.
A Study on Cucumber Absorption and Translocation of Exogenous Sugars;
黄瓜对外源糖吸收和运转的研究
10)  running
运转
1.
Running Status of Acute Flaccid Paralysis Case Surveillance System in Sichuan Province During 2005-2006;
2005-2006年四川省急性弛缓性麻痹病例监测系统运转情况分析
2.
Running Status and Evaluation of Chinese Polio Laboratories Network in 2007;
中国2007年脊髓灰质炎实验室网络的运转与评价
3.
Surveillance and Running Status of Laboratory Network for Measles and Rubella in China in 2007;
中国2007年麻疹/风疹实验室网络的运转与监测
补充资料:装机容量年利用小时数
      水电站多年平均的年发电量除以水电站装机容量的商数。度量单位为小时(h)。它是表示装机容量利用率的一项指标。  水电站装机容量年利用小时数,随着水库调节性能的大小,水电站在电力系统和综合利用中作用的不同而有较大的差异。凡在电力系统中担负基荷或腰荷的水电站,其利用小时数较高,凡担负峰荷的水电站,则利用小时数较低(图1、图2)。中国已建的大中型水电站,装机容量年利用小时数最高达7000h,最低仅1400h,多数在3000~5000h范围内。在初步选择水电站装机容量时,常用年利用小时数作初步估算,各类水电站合理的利用小时数,可参见有关的水利动能设计规程。在装机容量选定后,也可以利用这个指标,复核其正确合理性。在欧美等国家,常用装机容量利用系数表示装机容量的利用程度,其数值为装机容量年利用小时数和一年的总时数8760h的比值。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条