说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 观测相关
1)  observed correlation
观测相关
2)  correlated observation
相关观测
1.
In this paper, the range of the redundant observation component for correlated and uncorrelated observations is discussed, and the difference between the redundant observation component and the internal reliability is proved.
讨论了相关观测值与非相关观测值的多余观测分量值域问题;论证了相关观测值的多余观测分量与内可靠性指标的不一致性;进一步研究了可靠性指标的应用问题,认为当观测值的复相关系数不同时,应同时考虑内、外可靠性指标;最后,以GPS准动态测量为例作了分
3)  Correlated observations
相关观测值
4)  correlative observable
相关观测量
1.
The specialty of reliability for correlative observables is studied.
提出了基于相关分析的可靠性研究和粗差分析理论,并应用于相关观测量的多粗差分析。
5)  correlated measurement noises
相关观测噪声
1.
For the multisensor systems with correlated measurement noises and different measurement matrices,two correlated measurement fusion steady-state Kalman filtering algorithms are presented by using the weighted least squares (WLS)method.
对于带相关观测噪声和带不同观测阵的多传感器系统,用加权最小二乘(Weighted least squares,WLS)法提出了两种相关观测融合稳态Kalman滤波算法。
2.
For the multisensor systems with correlated measurement noises and unknown noise statistics,the on-line noise statistics estimators are obtained by the correlation method.
对带相关观测噪声和未知噪声统计的多传感器系统,用相关方法得到噪声统计在线估值器。
3.
For the multi-sensor linear discrete time-varying stochastic control systems with correlated measurement noises and different measurement matrices,two weighted measurement fusion Kalman estimators are developed by using the weighted least squares(WLS)method.
对于带相关观测噪声和带不同观测阵的多传感器线性离散时变随机控制系统,用加权最小二乘法(WLS)提出了两种加权观测融合Kalman估值器,它们包括状态滤波、状态预报和状态平滑。
6)  eddy-correlation observation system
船载涡动相关观测系统
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条