1) jumper spool
跨接短管
2) jumper
[英]['dʒʌmpə(r)] [美]['dʒʌmpɚ]
跨接线,跨接,跨[短]接片
3) jumper hose
跨接软管
1.
This paper gives a brief introduction of underwater soft yoke mooring system,summarizes water injection jumper hose change out between FPSO and SPM by two tug boats instead of a barge.
介绍渤海曹妃甸油田FPSO/SPM系泊方式,总结中国首次利用拖船代替平板驳船,成功完成外转塔水下软连接系泊方式下的注水跨接软管更换的设计与施工经验。
2.
The scheme of changing jumper hose between FPSO and SPM moored by underwater outer turret soft yoke system was optimized.
简要介绍了FPSO水下软刚臂系泊,对跨接软管更换方案进行了优化,成功组织和实施了我国首次外转塔式水下软刚臂系泊FPSO-SPM跨接软管更换,其设计和施工经验可供类似海事作业参考。
4) jumper tube
跨接管
1.
The performances of Xmas-tree,manifold,jumper tube and umbilical cable for the subsea production systems,the formulas and attentive problems in design and analysis have been introduced.
介绍了水下生产系统的几个重要组成部分——采油树、管汇、跨接管和脐带缆的性能,以及在设计、分析时采用的公式和应注意的问题。
5) cross over duct
跨接管道
6) hose nipple
软管短接
补充资料:星接阻抗和三角接阻抗的变换
星接阻抗和三角接阻抗的变换
transformation between starc-onnected and delta-connected impedances
x ing]一e乙日kongl介e sonJ一00}Iez日伙ongde匕一。一〕huon星接阻抗和三角接阻抗的变换(t ransfor-mation betweenstar一eonneeted and delta-eonneeted imPedanees)接成星形的三个阻抗和接成三角形的三个阻抗互相替代的等效变换。它们之间的关系可用一组变换公式表示。按这组公式,用星接阻抗替换三角接阻抗或者反过来,不会影响稳态下电路其他部分的正弦电压和电流,常用于对称三相电路的分析和计算。 图1为三个阻抗21、Z:、23接成星形(又称丫形)。图2为三个阻抗Z小22。、Zal接成三角形(又称△形)。它们之间的变换公式如下:人23土图1星接阻抗图2三角接阻抗(1)将星形连接变换成三角形连接212一Z:+22+2 122及3一22+za十警(1)、|冬|矛231一23+21+2321(2)将三角形连接变换成星形连接z、-二一典乒兴-) 艺‘2士乙“3十乙31…_2 oqZI,}Z。一下万~一二-二二-汁 乙‘2士乙23十乙3‘1_Z。IZoq}艺q一二二一~二,二二--,-二二-~J 乙12十乙23十艺32夕(2) 当三个星接阻抗相等,即21一Z:一23一z丫、三个三角接阻抗相等即212一223一231一Z△时,变换公式是 Z二一32丫,Z丫一Z△/3
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条