1) BOTM
浮式离底托管法
3) buoyant off-bottom tow method
离海底浮拖铺管法
4) BOT method
离海底浮拖法
5) float-over
浮托法
1.
The authors concluded that after 40 years of development,design,construction and installation of the living quarters for the fixed offshore platform in China has been very mature,the float-over method will be the main installation way for the living quarters,and the modularized production o.
浮托法将成为主要的海上安装方式,生活模块的组合式、可搬迁模块化生产将成为海上固定生活模块的发展方向。
6) float-over installation
"浮托法"安装
补充资料:浮浮
1.水或雨雪盛貌。 2.气上升貌。 3.流动貌。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条