1) false cap
临时顶梁
2) flirting post
临时顶柱
3) outrigger shore
外伸架临时顶撑
4) temporary roof supporting device
临时护顶装置
1.
This paper introduces the structure,working principle,technical indexes and main technical characteristics of fully-mechanized roadheader equipped temporary roof supporting device,and connecting with the its application in coal mine,probes into the superiorities of the temporary roof supporting device.
介绍了综掘机载式临时护顶装置的结构、工作原理、技术指标及主要技术特点,并结合其在煤矿的应用情况,探讨了该临时护顶装置的优势。
5) pier-beam temporary consolidation
墩梁临时固结
1.
This paper proposes a calculation methed of removal pier-beam temporary consolidation , according to the construction feature of continuous beam bridge.
针对连续梁桥悬臂施工的特点 ,给出了一种计算拆除墩梁临时固结时结构内力和变形的方法。
6) pylon and girder temporary fixity
塔梁临时固结
1.
In the process of cantilever construction of the main girders of the bridges,the commonly-used method of pylon and girder temporary fixity often results in cracks in the vicinity of Segments No.
预应力混凝土斜拉桥跨径不断增大,主梁宽度也不断增加,其空间效应越来越明显,在其主梁的悬臂施工过程中,通常采用的塔梁临时固结方式常常导致主梁0号块附近开裂。
补充资料:关于临时建设和临时用地
临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条