1) lagging
[英]['lægiŋ] [美]['lægɪŋ]
圈架板
2) racking loop
架圈
1.
They adopted pouring plasm,racking loop,opening unload slot etc measures in the broken shaft , consequently ensured mine to produce in gear.
济宁三号煤矿风井井筒破坏后,在破壁处进行注浆、架圈、开卸压槽等措施,从而保证矿井正常生产。
4) grillage
[英]['grilidʒ] [美]['grɪlɪdʒ]
板架
1.
The advances in stability analysis of ship grillages have been reviewed.
综述了船舶甲板板架稳定性的研究现状 ,内容涉及板架和加筋板的弹性稳定性、弹塑性稳定性、动力屈曲、可靠性和优化设计等 ,并对今后的研究作了进一步的展望。
2.
Based on the principle of the matrix displacement method, the program for computing the stability of the grillage in the large sized carrier is compiled.
根据有限元法的原理 ,编制了计算大型板架稳定性的程序。
6) coil frame
线圈骨架
1.
The structure of the parting line and sprue was determined based on the analysis of the structure and forming technology of the plastic coil frame.
通过对线圈骨架塑件的结构和成型工艺分析,确定了塑件的分型面与浇口结构,成功实现了以热流道1模16件的形式对其进行大批量自动化生产。
补充资料:国际地圈-生物圈计划
国际地圈-生物圈计划 International Geosphere-Biosphere Programme 国际科学联盟理事会(ICSU)发起和组织的一项重大国际科学计划。又称全球变化研究计划。英文缩写IGBP。为解决全球环境问题,1984年国际地学界提出了开展广泛合作,进行地圈-生物圈相互作用的研究,以揭开科学奥秘,保护人类赖以生存的地球环境。1988年ICSU正式提出计划大纲,并组成了IGBP科学委员会。这项计划的科学目标是描述和理解控制全球系统的、相互作用的物理、化学和生物学过程;描述和理解发生在该系统中支持生命的独特环境的变化,以及人类活动对上述基本过程及其变化的影响。研究重点集中在充分反映3个基本过程和圈层间相互作用的界面上,预测数十年至数百年对生物圈影响最大、对人类活动最敏感的重大全球变化问题。已形成近10个科学研究核心项目,初步形成一个完整的、多学科、跨学科的计划。参加这一计划的有40多个国家。中国于1983年起参与酝酿和讨论,1988年成立了国家委员会。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条