1) leaf dam
活板坝
2) articulated flat-slab buttress type dam
活节平板支墩坝
3) movement dam
活动坝
1.
DongGuan is the first project with turn-over movement dam designed and constructed by Chinese Engineers.
东关水利枢纽翻板式活动坝是我国自行设计、制造的第一座活动坝,此坝型可有效地减少上游洪水淹没损失及水库泥沙淤积,尤其适合于城区内河道的综合治理,坝顶无需工作桥和交通桥,坝型新颖美观,操作简便安全。
4) needle dam
横栅活坝
5) concrete face rockfill dam
面板坝
1.
Based on example,the paper mainly approached how to treat thick and soft groundsill on which earthrock dam or concrete face rockfill dam was build;the results from FEM showed that 25m of these two kinds of dam may be built on thick and soft groundsill if the groundsill was well treated,but earth-rock dam was better.
以达开水电站为例,研究了在深厚软弱地基上筑土石坝和混凝土面板坝的问题,通过有限元分析,说明在合理进行地基处理的条件下,在深厚软土地基上是可以兴建25 m的土石坝和面板坝,而建土石坝更加稳妥。
6) face rock-fill dam
面板坝
1.
The application of SR waterproofing materials and SR joint seepage prevention system to second-stage concrete face vertical fracture and fractures around toe slab at the face rock-fill dam of Dongba Hydropower Station is reviewed in this paper.
文章总结了SR系列止水材料及SR接缝防渗体系在洞巴面板坝二期混凝土面板垂直缝和趾板周边缝上的施工技术。
2.
Critical face rock-fill dam engineering technology as well as scientific and high-efficient construction management in Dongba Hydropower Station construction are introduced in this paper and serve as a reference for similar projects.
文章介绍了洞巴水电站面板坝工程关键施工技术措施和科学、高效能的施工管理以供同行参考。
补充资料:活板
1.见"活版"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条