说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 接缝灰浆
1)  joint mortar
接缝灰浆
2)  furrowed bed joint mortar
沟槽床接缝灰浆
3)  joint grouting
接缝灌浆
1.
The application of joint grouting technique in concrete dam construction of Xixiayuan project;
西霞院工程混凝土坝段接缝灌浆简介
2.
Supervision of joint grouting construction of I&Ⅱ bidding section of TGP;
三峡大坝I&IIB标接缝灌浆施工监理
3.
Dam joint grouting in Wanjiazhai water complex;
万家寨水利枢纽工程大坝接缝灌浆
4)  joint grout
接缝灌浆
1.
533 M m3 , and water cooling and joint grouting in concrete structure at the middle section of it were first applied in the world; the transverse cofferdam that should be placed within 4 months has a maximum height of 115 m with a crest length of 580 m and a volume of 1.
在纵向围堰中部的坝身段碾压混凝土结构内首次实现通水冷却和接缝灌浆。
2.
By using emulative visco elasticity three dimension finite element method, the water pipe cooling for joint grouting of concrete dams has been studied in this paper.
采用全过程仿真粘弹性空间有限单元法对接缝灌浆水管冷却问题进行了计算研究 ,对冷却水温、冷却延续天数进行了敏感性分析 ,提出了只进行一期水管冷却 ,并在适当“超冷”情况下进行大坝接缝灌浆的建议 ,不但简化了施工步序 ,也有利于大坝的整体性 ,计算研究结果可供混凝土坝施工设计参考应用 。
5)  grouted joint
灌浆接缝
6)  Vertical-joint-grouting
纵缝接缝灌浆
补充资料:接缝灌浆
      用压力将水泥浆液灌注到混凝土坝体接缝中的工程。混凝土坝施工时,为防止产生温度裂缝和受到浇筑能力的限制,常以横缝将坝体分成若干坝段,每一坝段又以纵缝分成几个坝块,采用分段、分块、分层交替上升的柱状浇筑法(见混凝土施工)。为保持坝体在运行时的整体性和有效地传递应力,需要在大坝投入运行前对这些接缝进行灌浆。有的重力坝只要求进行纵缝灌浆,横缝不灌浆,作为伸缩缝,设有止水。接缝灌浆均采用水泥浆液。为保证灌浆质量,须在坝体内部混凝土温度达到稳定值,或混凝土龄期超过六个月,并且灌缝两侧及顶层盖重混凝土的温度达到设计规定值时,方可进行灌浆。因此,接缝灌浆常是水库开始蓄水的控制条件。灌浆需自下而上分区进行。通常用止浆片将各缝面划分为若干封闭的灌浆区,一个灌浆区的高度约10~15m,面积为200~300m2。灌浆管路可采用预埋铁管或塑料管,也有采用塑料拔管,即先埋入塑料软管,并充气,在混凝土终凝后即将软管拔出形成通路的办法。混凝土浇筑过程中,要注意防止堵塞灌浆管路系统。接缝灌浆的质量需通过对施工记录资料的分析、钻孔取样、压水检查和缝面凿槽检查等成果综合评定。检查工作在灌浆结束28天以后进行。有的工程还考虑进行重复灌注的措施。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条