4) the water quantity needed
吸夺河水量
1.
The water quantity needed of the water source area along the river is focused by people working in water resources field all the time, but in the calculation of Haicheng water source area, the correlation curves are established among the water quantity needed of,W河,the exploitation quantity of, W开, and , which solves greatly the above problem.
沿河水源地吸夺河水量推求问题,一直是水学界讨论的焦点,在对海城水源地的计算中,采用水源地吸夺河水量W河比上水源地开采量W开与式X20/4at建立相关图的方法,很好地解决了这一问题。
5) the discharge of river
河水基流量
6) bank storage
河岸蓄水量
补充资料:河道洪水演进(见河道洪水演算法)
河道洪水演进(见河道洪水演算法)
neaao non郎hUi河道洪水演进yanJ县n 见河道洪水演算法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条