1) working fastening
临时固定
2) provisional fixed bridge
临时固定桥
1.
Clinical study of the effects of early application of provisional fixed bridges;
拔牙后即刻临时固定桥修复的临床观察
3) program temporary fix,PTF
程序临时固定
4) working fastening
临时固定暂钉
5) The permanent staff and part-timer.
固定职员和临时工
6) temporary consolidation
临时固结
1.
Taking the main bridge ? cable-stayed bridge of Hedong Bridge over the Zhujiang River in Guangzhou City as the project background, the paper introduces the general principle and method of temporary consolidation devices during the cantilever construction of large-span bridges such as cable stayed bridge etc.
本文以广州珠江鹤洞大桥主桥斜拉桥为工程背景 ,介绍斜拉桥等大跨度桥梁悬臂施工过程中临时固结装置的一般原理和方法 ,特别介绍鹤洞大桥主桥斜拉桥临时固结装置的新构思、新设计以及安装和拆除工艺等。
2.
And then thread steels fingering in the girder are pre-embedded at the top of the temporary concrete filled steel tube supporting pier to achieve the temporary consolidation between the girder and the temporary supporting pier.
铜九铁路吴家湾特大桥连续梁0#块施工过程中,根据现场实际,利用承台首先支立钢管混凝土临时支墩,再通过墩身预埋件安装支架体系其它构件,并在钢管混凝土临时支墩顶部预埋螺纹钢伸入梁体,实现梁体与临时墩的临时固结,完后进行混凝土浇筑。
补充资料:临时固定合同再保险
临时固定合同再保险
【临时固定合同再保险1见“预约再保险”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条