1) single point suspension spreader
单点吊具
2) four point suspension spreader
四点吊吊具
3) single-lift hoisting equipment
单点吊机
4) single-point lifting
单吊点
5) Sling
[英][slɪŋ] [美][slɪŋ]
吊具
1.
Manufacturing of sling for large electric furnace body;
大电炉炉壳吊具制作工艺
2.
Improvement of sling of structural component coating line;
结构件涂装线吊具的改进
3.
Parametric design and finite element analysis of special sling used in large equipment installation
大型设备专用吊具的参数化设计与有限元分析
6) hanger
[英]['hæŋə(r)] [美]['hæŋɚ]
吊具
1.
Dynamic Simulation of Hanger of H Section Steel in ADAMS;
基于ADAMS的H型钢吊具的动力学仿真
2.
This paper analyzes on the possibility of adopting the anchor line suspended monorail hoist runway, and designs and develops the hanger of the anchor line suspended monorail hoist runway, which solves the problem of the erection of the monorail hoist runway in the transportation adopting the monorail hoist in the ground coal road stage with the total bolt support.
分析了用锚索悬吊单轨吊道的可行性,设计并制作了用锚索悬吊单轨吊道的吊具,解决了全锚支护底煤巷顺槽采用单轨吊进行运输时单轨吊道的安装问题。
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条