说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 短程调度
1)  short-term schedule
短程调度
2)  short-term scheduling
短期调度
1.
Recipe Optimizing and Short-Term Scheduling for Oil Blending;
油品调合配方优化及短期调度问题研究
2.
Review for short-term scheduling of batch processes based on time representation
基于时间描述的批处理短期调度方法综述
3.
The first part of this paper presents a model for the short-term scheduling of multiproduct singlestage batch plants with parallel lines.
本文第一部分建立了具有并行处理设备多产品单阶段批处理过程短期调度的基本数学模型 。
3)  short term scheduling
短期调度
1.
The short term scheduling of multiproduct singlestage batch plants with parallel lines involves the constraints of the release times and due dates of orders, as well as the sequence dependent setup times and forbidden sub sequences of orders production and the ready times of units.
具有并行设备的多产品单阶段批处理过程短期调度问题需考虑订单发布时间、交货期 ,订单生产的顺序相关建立时间、禁止生产子序列 ,及设备的准备时间等生产约束 。
4)  short-range structure
短程度
5)  shortage level
短缺程度
1.
Based on natural condition, water resource situation and contradiction between water supply and demand in Tongsuo District, the writers made an analysis on river runoff and exploitable amount of groundwater, proved the shortage level of water resources, estimated the total water demand and that of 2010.
针对同朔地区自然条件、水资源状况和供需之间的矛盾 ,分析了该地区河川径流量和地下水可开采量 ,客观地论证了该地区水资源的短缺程度。
6)  short-time horizon coordination
短时程协调
补充资料:短期保险费


短期保险费


【短期保险费】保险单中的保险期限不足一年并按短期费率计算的保险费。如投保人要求投保短期保险,保险人有权按照短期费率表的规定收取从生效日起至合同终止日为止的短期保险费。保险期限不足一个月的,按一个月计算,但如果按法律或者按保险合同的协议,保险人提前终止保险合同时,则应当按日计算未到期的保险费,余款退还给投保人。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条