1) scheme
[英][ski:m] [美][skim]
计划;图
2) planning chart
计划海图
3) Blueprint
[英]['blu:prɪnt] [美]['blu'prɪnt]
蓝图/计划设计图
4) The Mental Mapping Project
思想图计划
1.
The Mental Mapping Project was proposed in November 2002 in Nature 420:121,2002.
2 0 0 2年 11月绘制思想图计划在自然杂志上发表 (Nature 42 0 :12 1,2 0 0 2 )。
5) network graph
网络计划图
1.
Unit maintenance is important to the safe production of power plant ,and the project planning using network graph can improve its efficiency.
电厂机组检修是保证电厂安全生产的一项重要工作,而机组大修网络计划图的应用可以大大提高电厂机组检修工程的效率。
2.
Project planningby network graph can improve the efficiency of the maintenance.
网络计划技术是一种广泛应用在各个生产领域中的科学管理方法,网络计划图是网络计划技术的表现形式。
6) Itinerary Graph
迁移计划图
1.
Improved Migration Strategy of Mobile Agent Based on Itinerary Graph;
一种改进的基于迁移计划图的移动Agent迁移策略
2.
Itinerary graph can effectively describe the migration semantics; mobile agent with itinerary graph can perceive the changesof network environment and dynamically choose the best migration path based on these changes, which embodies fully the reactivity and autonomyof agent.
在分析了现有迁移机制的基础上,提出了一种基于迁移计划图的结构化迁移机制。
补充资料:放矿计划图表
放矿计划图表
chart of ore drawing
fong伙旧ng]lhuo tub旧。放矿计划图表(ehart of ore drawing)在崩落岩石覆盖下放矿时,根据选定的放矿制度和尽量提高矿块出矿强度等要求编制规定各漏斗放矿先后、时间和数量的计划图表。放矿计划图表应表明在什么时间、从哪些漏斗分别放出多少矿石和岩石。 采用依次放矿的放矿制度时,可以根据物理模拟放矿结果编制放矿计划图表。因为在这种放矿制度中,从各个漏斗放矿的次序已经确定;在某一时间某一漏斗的一份放出中的矿石量和岩石量是多少,也能通过物理模拟放矿加以确定但用随机模拟放矿去编制该放矿计划图表、则更为准确。对用削高峰的放矿制度时,漏斗间放矿的顺序取决于高峰落在哪个漏斗上面物理模拟放矿过程中无法知道高峰落在哪个漏斗上面,靠估算则精度又太低;简易的办法是进行随机模拟放矿在随机模拟放矿中,按不断削高峰原则确定的各漏斗放矿的次序仍然是依次的,矿块的出矿强度太低为了提高矿块的出矿强度,应尽量增多同时放矿的漏斗.但应满足下列要求:(l)在同一条电耙巷道中不同时从两个以上的漏斗放矿,以免无法记录从每个漏斗放出量。(2)对于同时放矿的两个以上的漏斗,个漏斗放矿不应导致另外漏斗轴线上的崩落矿岩接触点下移.以保证崩落矿岩接触面尽量按要求下降。满足这两项要求的方法是,轮到从某漏斗放矿时,就把从该漏斗放矿的日期排在已排过的最后一天,然后看是否满足这两项要求。如果能满足,则往前挪一天;如果不能满足,则把这个日期排在最后一天的后面这样编制的放矿计划图表,就是放完该矿块的通盘计划图表。执行这种放矿计划图表时,还应逐日累计从每个漏斗放出的矿岩量,通过多退少补,使实际的累计量靠拢计划值 (苏宏志)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条