完成车间
4) Makespan
完工时间
1.
The minimum time that needs to execute a batch of tasks is called makespan.
若干台处理机完成一批任务所需要的最少时间称为完工时间。
2.
A kind of genetic algorithm based on combinatorial rules is presented for solving the identical machine scheduling problem of minimizing the makespan,that is,scheduling policy is optimized by genetic algorithm,and it allows that different scheduling rule to be adopted at different scheduling stage to improve the performance of the algorithm.
本文对最小化完工时间并行多机调度问题提出了一种基于组合规则的遗传算法 。
3.
The objective is to minimize makespan.
之间有广义偏序,则Jj→Jk,且Jj的完工时间与Jk的开工时间的间隔不小于ljk和不大于ujk,0ljkujk。
5) turning shop
车工车间
6) total flowtime
总完工时间
1.
Objective increment based metaheuristic for total flowtime minimization in no-wait flowshops;
基于目标增量的最小化总完工时间无等待流水调度智能算法(英文)
2.
Hybrid evolutionary algorithm for no-wait flow shops to minimize makespan and total flowtime;
最小化最长完工时间和总完工时间的无等待流水调度混合进化算法(英文)
3.
Hybrid tabu search algorithms for permutation flow shops to minimize total flowtime;
最小化总完工时间的流水作业调度混合算法