1) circulating water piping
![点击朗读](/dictall/images/read.gif)
循环水管系
2) circulating water pipe
![点击朗读](/dictall/images/read.gif)
循环水管
1.
Uneven subsidence of circulating water pipes of 900 MW units;
![点击朗读](/dictall/images/read.gif)
900 MW机组循环水管不均匀沉降问题分析
2.
Through on analysis of the corrosion condition and coatings requirements for underground steel circulating water pipes in thermal power plant.
分析了火电厂埋地钢质循环水管的腐蚀环境和涂层使用要求等,介绍了埋地管道应用的多种涂层体系,着重介绍了高固体分改性环氧防腐蚀涂料系统在循环水管上的应用。
3.
0, a stress analysissoftware about circulating water pipe of turbine unit is designed and developed by the guidance of the theoryof database design and the applied background of the test of a N300MW turbine unit in order to conquer thelimitation of traditional programming methods and with a view to the solution of spot problem.
0数据库与多媒体编程技术,以数据库设计理论为指导,以某电厂N300MW汽轮机现场试验为应用背景,设计开发了汽轮机组循环水管应力分析软件。
3) water-circulating pipe
![点击朗读](/dictall/images/read.gif)
水循环管
4) circulating water system start-up under condition of empty pipes
![点击朗读](/dictall/images/read.gif)
循环水系统空管启动
1.
Analysis on circulating water system start-up under condition of empty pipes in thermal power plant
热力发电厂循环水系统空管启动分析
5) mana gement of circulating water
![点击朗读](/dictall/images/read.gif)
循环水管理
6) circulating cooling water steel piping
![点击朗读](/dictall/images/read.gif)
循环水管道
1.
The paper also introduces the welding procedure of circulating cooling water steel piping,which shows how to make an improvement to the welding procedure,welding .
介绍了该项目循环水管道的优化焊接工艺,优化管口、加强肋焊缝的布置,并对焊接工艺及验收标准进行优化,改进焊接坡口和焊接方法。
补充资料:钢筋混凝土循环水管施工
钢筋混凝土循环水管施工
reinforced concrete circulating water pipe construction
gongjln hunn一ngtu xunhuanshu一guan sh一gong钢筋混凝i循环水管施工(reinforced con-erete eireulating water pipe eonstruetion)有现浇和预制两种施工方法。现浇管在挖沟完后,在沟内分段浇筑。预制预应力管在工厂制作,再运到现场敷设。预制管工厂的设备比较简单,如工程地点离工厂较远而该种管子数t多时可将设备搬到现场制造。管子的直径可达3m甚至更大,长度一般为4m。 预制预应力钢筋棍凝土管预制,可用一阶段(展动挤压)工艺或三阶段(管芯绕丝)工艺施工。一阶段工艺系用申立式成型,用加工精密的内外钢套模组合定型,将主钢筋张拉完成后,即浇筑混凝土一次成型,经静定时间后蒸汽养护.三阶段工艺系按上法先浇制混凝土管芯,成型后再在管芯上缠绕预应力钢丝,用机械或电热法张拉,然后再喷盖水泥砂浆保护层,以防钢丝生锈,经水压试验合格后出厂使用。 数设带承插口的钢筋混凝土预制管挖沟徽设.平口对接的钥筋混凝土预制管除挖沟徽设外,还可采用顶管施工(见取水构筑物施工)。挖沟后按设计规定在沟底铺一层黄沙或石子,再用起重机械将预制管逐节吊人沟内、找正位!,在插口上套上橡胶密封圈后,往前一节的承口方向水平加力拉紧,使插口和橡胶圈同时均匀地嵌人承插口内,按此步探依次进行下一节管的安装.橡胶圈本身的直径略大于承插口间尺寸,并有规定的压缩比及防老化剂。在承擂口内侧采用钢衬圈和密封环进行环向水压试验.水压试验的标准按设计和规范要求。安装后进行回坟土,要求在两侧均匀回填分层夯实。 预应力钢筋混凝土管自重较大,在软土地区使用时要做混凝土基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条