说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 锚桩模块
1)  anchor pile module
锚桩模块
2)  dead head
木块锚标;系缆木桩
3)  Pile-anchor
桩锚
1.
Retaining structures combined pile-anchor with soil nails considering vertical soil arch;
考虑竖向土拱的桩锚与土钉的联合支护
2.
On the characteristics of the pile-anchor supporting structure of the door frame type reinforced concrete
门架式加筋水泥土桩锚支护结构的特点与受力
3.
In this article,authors introduce the design and construction of composite supporting technique of soil nailing and pile-anchor in a deep foundation pit support under complex environment and geological conditions,and mainly present the design measures and technical measures under special condition.
介绍了在复杂环境与地质条件下某深基坑土钉与桩锚联合支护技术的设计和施工,重点介绍了设计方案以及在特殊情况下采取的技术措施。
4)  anchor pile
锚桩
1.
Study on optimization of anchor pile spacing for Goupitan Hydropower Station;
构皮滩水电站锚桩间距的优化研究
2.
Discussion of the anchor pile static load experimentation on the impact of anchor pile;
锚桩静载试验法考虑锚桩影响的讨论
3.
Ultimate pull bearing capacity of anchor pile on working derricks determined by mechanical impedance method;
用机械阻抗法确定作业井架地锚桩的极限承载力
5)  pile anchor
桩锚
1.
In combination with practical example of a foundation pit supporting in Changsha,technical and economic comparisons and analyses were made for several support schemes,the optimal method is combined support of soil nailing wall and pile anchor,and the design method and construction technique of the combined support technology were introduced in this paper.
结合长沙某深基坑支护工程实例,对多种支护方案进行技术、经济对比分析,优选了土钉墙+桩锚的复合支护,并介绍了这种复合支护技术的设计方法与施工技术。
2.
In view of complex peripheral environment in the site of foundation pit of Science and Teaching Building of Wu- han First Hospital,information construction and combined supporting method were adopted with pile anchor retaining,soil nailing wall with mesh shot-concrete and concrete anchor.
针对武汉市第一医院科教楼基坑极为复杂的周边环境,采用桩锚支护、土钉墙挂网喷砼支护、喷锚支护的联合支护方案和信息法施工,保证了基坑和周边建筑物及地下管线的安全,降低了工程成本,缩短了工期,取得了很好的经济效益和社会效益。
6)  anchor block
锚块
1.
According to the results calculated by FEM, the effects on stresses with and without the ear of anchor block were compared and discussed, and the different interface modelings between the bottom of anchor block and pier were summarized.
根据计算结果,比较分析了锚块颈部伸出段的安装支座部位(锚块耳朵)去掉前后对锚块和闸墩的受力差异,且讨论了锚块底部与闸墩的3种不同接触方式的模型对计算结果的影响。
2.
Finally,the effect of different interface models between the bottom of anchor block and pier was discussed.
根据有限元计算结果,评价了边墩混凝土结构的预应力效果,并探讨了锚块底部与相应闸墩顶面两种不同接触方式对结果的影响,为结构的设计、施工提供参考依据。
3.
The bearing loads of spillway piers and anchor block of a hydropower station are extremely large;and the maximum thrust of a single radial gate shoe will reach 20 543 kN.
某水电站溢洪道闸墩锚块承受荷载较大,弧门单个支铰处最大水推力达到20 543 kN。
补充资料:岩石锚桩基础


岩石锚桩基础
rock-anchor pile foundation

翼鳝蒸巍揣骗廿瓢为直接建造在鞘上的土业广触下郭以脉受较蒙耀粼翼黝…黑篙蓄粼_一姚- 径。.二-一辉_
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条