1) catchment area
积水面积
2) drenching area
淋水面积
1.
Based on analyzing the formula of thermodynamic calculation of counter-flow coo ling tower, the effective factors on drenching area are analyzed throu gh many data of some counter-flow cooling towers.
在分析逆流式冷却塔热力计算公式基础上 ,通过对国内已建成的部分逆流式冷却塔淋水面积的分析 ,指出逆流式冷却塔内的淋水装置架构支柱、主梁、次梁 ,配水竖井和主水槽对淋水面积的影响 ,提出对逆流式冷却塔淋水面积的定义及计算方法的建议。
4) Pattern water flooding
面积注水
5) Catchment area
汇水面积
1.
For this,some problems,including indefinite partition of catchment area,inaccurate calculation of runoff coefficient,determination of designed storm strength and drainage,are analyzed.
而雨水口设计中往往凭经验确定布设距离等参数,针对于此,笔者对汇水面积划分不明确、径流系数不准确、设计降雨强度的确定及泄水量计算等问题进行了探讨,并结合具体实例进行了分析,对雨水口的设计提出了建议。
2.
Based the characteristics of smooth terrain,backwater effect of river water level and summer rainfall concentration in the northern plain cities,The key elements in design of municipal rainwater pipe network,such as collecting time,catchment area,runoff coefficient,rainfall recurrence interval,flooding velocity,rainwater inlets and so on are analyzed.
针对北方平原城市地势平坦、河道水位顶托、夏季降雨集中的特点,对集流时间、汇水面积、径流系数、暴雨重现期、淹没流速、雨水口等几个市政雨水管网设计中的要素进行分析,提出了最佳取值的选取方法,以达到优化设计的目的。
6) water area
水域面积
1.
The water level of Qinghai Lake descends and its water area reduces in recent years owing to the climate changing.
近年来,由于气候条件的变化,青海湖水位呈下降趋势,水域面积逐年缩小。
2.
In this article, we created the relative models between meterorological conditions, water level in Hukou county and water area of Poyang Lake region.
根据鄱阳湖区和5大河流域重点县(市)的气象资料、鄱阳湖湖口水位和NOAA卫星监测到的历年不同季节鄱阳湖主体及附近水域面积,建立了光、热、水、蒸发等气象因子、湖口水位与鄱阳湖主体及附近水域面积关系模型。
3.
The present water area and the coastline length of the Jiaozhou Bay were measured by using Landsat-5 TM image acquired on May 20,2006.
利用2006年5月20日Landsat-5 TM卫星数据对胶州湾的现存水域面积与岸线长度进行了量算,结果给出胶州湾2006年现存总水域面积为353。
补充资料:积水
分子式:
CAS号:
性质:又称蓄水。是一种蓄积起来的水体。例如水池中的水,水坝所圈闭的水,用水闸及围堤拦住的水体等。
CAS号:
性质:又称蓄水。是一种蓄积起来的水体。例如水池中的水,水坝所圈闭的水,用水闸及围堤拦住的水体等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条