1)  foreshore
前滨
2)  lower beach
前滨
3)  foreshore profile
前滨剖面
1.
Based on the repeatedly measured data including waves, currents, beach underwater tables and the foreshore profiles for every hour over several days in the Houjiang Bay of the eastern Guangdong coast, four significant canonical correlation variables, accounting for more than ninety percent of the total variance, were extracted by CCA.
利用在粤东后江湾多日逐时连续观测的近岸波浪、流、海滩潜水位和海滩前滨剖面地形数据,通过典型相关分析方法提取了占总方差90%以上的4个显著的典型相关变量,进而分别论述了常波况下海滩前滨剖面不同部位的地形动力过程。
4)  beach face,foreshore
前滨(地)
5)  foreeshore berm
前滨阶地
6)  mud foreshore
泥质前滨
7)  foreshore
海滩;前滨
8)  Foreshore and nearshore
前滨和临滨
9)  Foreshore and Sea-bed (Reclamations) Ordinance (Cap.127)
前滨及海床(填海工程)条例(第127章)
补充资料:关于solidworks 中的剖面线中的剖面线

solidworks的剖面线线型定义和autocad相同,它使用了autocad的剖面线定义方法,与autocad通用.因此,可以对剖面线进行定义.


方法:修改\SolidWorks\lang\chinese-simplified\sldwks.prn


用笔记本打开该文件,添加需要的线形.如


;; Based on AutoCAD Ver.13.0s Hatch Pattern File


;;;; solidworks 区域剖面线定义文件 ::


*金属, (Iron BrickStone), ANSI Iron, Brick, Stone masonry


45, 0,0, 0,.125


*塑料, (Lead Zinc Mg), ANSI Lead, Zinc, Magnesium, Sound/Heat/Elec Insulation


45, 0,0, 0,.125


135, 0,0, 0,.125


*玻璃,AR-GLASS@1.0


45,0,0,0,0.5, 0.5,-0.5


45,0,0.1414214, 0,0.5, 0.3,-0.7


45,0.1414214,0, 0,0.5, 0.3,-0.7


*软木, Cork material@1.0


0, 0,0, 0,.125


135, .0625,-.0625, 0,.35355339, .176776696,-.176776696


135, .09375,-.0625, 0,.35355339, .176776696,-.176776696


135, .125,-.0625, 0,.35355339, .176776696,-.176776696


*无, None


删除不需要的定义类型,可以大大提高solidworks 的启动速度

说明:补充资料仅用于学习参考,请勿用于其它任何用途。