1) master schedule
主作业计划,生产进度总表
2) master schedule
进度计划总表
3) scheduling of production plan
生产调度作业计划
4) production planning and scheduling
生产计划与作业调度
1.
Production planning and scheduling was the core of production and marketing management as well as the key technology which determines anticipated profits in complicated flexible manufacturing system.
在现代制造系统中,生产计划与作业调度是企业生产经营与管理,尤其是复杂、柔性制造系统能否取得预期经济效益的关键手段之一。
5) calendar progress chart
工作计划进度表
6) production schedule
生产进度计划
1.
An approach to the establishment of die & mould production schedule based on concurrent engineering,network planning technique and optimal production technology was put forward.
在充分考虑模具生产的特点和生产活动之间并行性的基础上,建立了单副模具典型生产过程的细化网络图,提出了一种基于并行工程、网络计划技术和最优化生产技术(OPT,Optimal ProductionTechnology)的模具生产进度计划编制方法。
2.
According to the traditional production schedule method, the production capability is balanced and the production lead time and economic production quantity is fixed and invariable, however, such production schedule cannot reflect actual production, so that actual production often fails to fulfill the quota on schedule.
传统的生产进度计划方法假设生产能力是平衡的 ,生产提前时间和经济生产批量是确定的 ,以之为基础制定的生产进度计划不能反映现实的生产状况 ,实际的生产经常不能按预定的进度完成。
补充资料:主产品进度计划MPS(master production schedule)
主产品进度计划MPS(master production schedule):根据营销计划、BOM和工艺规程决定成品出厂时间和各种零部件的制造进度。他决定了产成品与零部件在各个时间段内的生产量,包含产出时间、数量或装配时间和数量等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条