1) span by span construction
逐跨施工(法)
2) By cross technology
逐跨施工法
3) span-by-span installation
逐跨拼装
1.
Described hereby are the initial study and summary of the key measures and precautions taken during the construction of prefabricated segment span-by-span installation of Hu-Min Rd Viaduct (II), and Jungong Rd Viaduct (Contract A1.
1标军工路高架预制节段逐跨拼装施工的实践为基础,初步探讨、总结了该类施工方法在技术管理上前期预备阶段、实施准备阶段、实施阶段的主要方法和注意点。
4) span-by-span collapse
逐跨塌落
5) Short-delay frame by frame
逐跨微差
6) civil-air-defence
逐跨坍塌
1.
To protect underground civil-air-defence in blasting, a certain length of bottom columns of first floor without drilling holes were reserved.
介绍在复杂环境下 ,对一特殊结构大面积厂房采用横向逐跨坍塌爆破拆除的方案。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。