说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 招标制
1)  competitive bidding system
招标制
2)  bidding system
招投标制
1.
On BOQ valuation and the perfection of bidding system;
浅谈工程量清单计价和完善招投标制度
3)  tendering system
招标制度
1.
Analysis is carried out on the mechanism of tendering system and the system structure from perspective of assets right,transaction cost,principal and agent relationship of large hydroelectric power construction project.
从大型水电建设工程的产权、交易成本、委托代理关系等方面,对招标制度的机理和制度结构进行了分析。
4)  bidding mechanism
招标机制
1.
Research on Bidding Strategy and Bidding Mechanism under Game Theory Model;
对策理论模型下的招标机制与投标策略研究
2.
From the bidding mechanism in the game theory, a public bidding mechanism through a shared platform on Internet is established, which help candidate suppliers bid in an open and transparent environment.
从博弈论中的有关招标机制的原理出发 ,提出一种基于共享平台的招标机制设计。
3.
In the development of economic house, it is very helpful to use market—especially bidding mechanisms to enhance the efficiency of project development.
在经济适用房项目开发建设中充分利用市场机制尤其是招标机制,有利于提高项目的开发建设效率。
5)  bid contrul
招标控制
6)  compulsory bidding
强制招标
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条