1) coal tressel
运煤栈桥
2) coal conveying diagonal viaduct
运煤斜栈桥
3) coal-conveyer-gallery
输煤栈桥
1.
In this paper,at first,a finite element three-dimensional modal is built by ANSYS program for a coal-conveyer-gallery which has been used for 10 years.
针对一座已使用10年的输煤栈桥,运用ANSYS通用有限元软件建立该结构的三维模型;分析了该结构在不同锈蚀等级、不同运载情况下的静力响应;针对结构跨度较大的特点,考虑行波效应,采用多点非一致激励反应谱法进行了结构的地震响应分析,为结构的安全使用提供了参考。
2.
It is unavoidable, the coal-conveyer-gallery works with double feeding straps, when generating electricity with full or beyond designed capability.
在满发、超发条件下,输煤栈桥双胶带输煤是在所难免的。
4) coal conveying viaduct
输煤栈桥
1.
Optimization of profiled bar selection for coal conveying viaduct;
输煤栈桥钢材选型的优化分析
2.
Through the use of economic comparison between viaduct and reticulated framed structures used in coal conveying viaduct, the reticulated framed structure is proved an advanced and economic technology adopted in large span coal conveying viaduct.
通过对栈桥和网架在大跨度输煤栈桥中的应用进行经济性比较,证明输煤栈桥采用网架结构是技术先进、经济合理的。
5) coal handling gallery
输煤栈桥
1.
The design of the coal handling gallery for 2×300 MW coal-fired units in Wenzhou Power Plant,phase II adopted a new torsion type inte-gral mesh frame structure,which was analyzed by 3-dimensional force applied.
温州发电厂二期工程2×300MW燃煤机组的输煤栈桥设计,采用一种新型的扭剪型整体网架结构,该结构采用三维受力分析。
2.
Pointing to the problems existing in conventional design of the coal handling gallery in thermal power plants and combining the structural design of the coal handling gallery in Hebei Dingzhou Power Plant (2×600 MW), the author has optimized the structures of the coal handling gallery according to the structural systematic scheme and structural analysis method and obtained the economic benefits.
针对火力发电厂输煤栈桥结构常规设计存在的的问题 ,结合对河北定州电厂 (2× 6 0 0MW )输煤栈桥的结构设计 ,从结构体系方案、结构分析方法等方面对输煤栈桥结构进行了优化 ,取得了很好的技术经济效果。
3.
Moreover,the installation problems of coal handling gallery of span concentrated control building are solved by applying high level sliding construction technology.
结合襄樊电厂二期主厂房区域土建工程按,介绍了栈桥拼装平台搭设计算、滑道设计、滑移技术,通过运用高空滑移施工技术解决了跨集控楼输煤栈桥的安装难题,节约了工程成本,缩短了工期。
6) coalmine bridge
煤矿栈桥
1.
The destruction reasons of the beams of a coalmine bridge framework were more deeply analyzed, and the corresponding mechanics models were established for two main factors that may produce destruction.
就某煤矿栈桥框架结构梁的破坏进行了深入分析,并针对其中可能产生破坏的两个主要因素建立起相应的力学模型,分别进行计算分析,求得各自可产生的作用。
补充资料:灵石通宇煤运有限公司
山西省灵石通宇煤运有限公司简介
灵石通宇煤运有限公司改制组建于2001年,位于南同蒲铁路和108国道中段的能源重化工基地-晋中市灵石县,是一个以煤炭化工为主,多业并举,统一管理,综合发展的集团化企业。现拥有资产6.8亿元,职工2000余人,拥有铁路发运站3个,专用线2条,具备整列装车和大列发运的能力,年发运能力达500万吨。近年来,公司通过低成本扩张和实体化运作,已基本形成集煤炭生产、加工、运输、销售、服务和非煤产业多种经营为一体多元化的产业格局,经营范围涉及煤炭生产、销售、洗选加工、焦化、化工、硫铁矿、商贸、旅游、饮品等领域,主要产品有原煤、精煤、焦炭、煤焦油、甲醇、液氨、硫铁矿等。2005年实现销售收入6.7亿元,利润830万元,均创历史最高纪录,上缴税金4100万元,是上年的2倍,连续四年居全县首位。煤焦产品行销河南、河北、山东、天津、上海等省市,并出口韩国、日本、巴西等国家与地区。
几年来,公司在董事长兼总经理张建新的带领下,认真落实以人为本,全面协调可持续的科学发展观,紧紧围绕做大做强产业的战略目标,按照"一业为主,多业并举、综合发展"的经营理念,通过深化企业改革,产业结构调整,实体化运作,企业文化建设等一系列举措,使公司走上了持续、健康、协调发展的轨道,企业的综合实力和企业形象也进一步提升,发展成为对县域经济起带头作用的龙头企业,先后荣获“省级文明单位”和县“明星企业”等荣誉称号。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。