说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 淤积树脂
1)  resin pocket
淤积树脂
2)  pregel
树脂淤积层(增强塑料表面)
3)  pitch deposition
树脂沉积
1.
Certain water soluble polymers can be effective in prevention and controlling of pitch deposition in papermaking processes.
本文阐述水溶性聚合物类助剂对树脂沉积的控制机理、相关助剂的种类及应用技术,指出相关研究、开发及应用的重要性。
2.
Tall oil was used as a model compound of the pitch in the pulp suspension to study the effects of calcium soaps on the pitch deposition with and without fibers.
利用塔罗油作为新闻纸厂浆水体系中树脂的模型物,分别在有纤维和无纤维存在下研究了钙皂对树脂沉积的影响。
3.
Tall oil was used as a model compound to study the effects of calcium soap and the pulps on the pitch deposition.
以塔罗油为模型物,在纸浆存在的条件下研究了钙皂的存在对树脂沉积的影响。
4)  resin bed volume
树脂床体积
5)  spent ion exchange(r)resin slurry
废离子交换树脂淤浆
6)  siltation
淤积
1.
Characteristic of Circumfluence in Dredged Harbor Basins and Its Influence on Siltation;
挖入式港池回流特性及其对淤积的影响研究
2.
Tidal Current Numerical Simulation and Sedimental Siltation Analysis of 300,000-ton Crude Oil Dock of Lanshan Port Area, Rizhao Port;
日照港岚山港区30万吨原油码头工程潮流数值模拟及泥沙淤积分析
补充资料:坝区泥沙淤积


坝区泥沙淤积
sedimentation in dam area

boqLJ rl}sho ytljl坝区泥沙淤积(Sedimentation in dam area)河流上筑坝塑水后,由于塑水区内水深加大,流速降低,泥沙沿程淤积,并向坝前推进,造成坝前泥沙的淤积。坝区泥沙淤积产生的问题主要有:①在船闸引航道中及其口门附近产生淤积,使航深不足或水流不顺而有碍通航。②电站进水口前的泥沙堆积使过机水流中的含沙量增大,泥沙变粗,造成过水建筑物或水轮机过流部件的严重磨损。③坝前泥沙淤积有可能影响问门启闭,堵塞泄水孔,影响大坝安全。 以通航为主的枢纽和以发电为主的枢纽对坝区水流条件的要求不同,防治坝区泥沙淤积的措施也不一样。 (1)以通航为主的枢纽。宜将船闸布置在靠近稳定深乱线一侧,要避开弯道的凸岸和回流、缓流区。这些地区都是泥沙集中淤积处,且淤积后又难于冲走。结合各个工程的实际情况,可设置某些导流排沙工程,如修建引航导墙以破除回流减少淤积;设置底部高程较低的冲沙闸,以定期冲刷上游及下游引航道淤沙。 (2)以发电为主的枢纽。高水头水电站的防沙措施主要是设置高程较低的排沙孔。排沙孔布置在机组进水口的下面,防沙效果最好,但结构复杂,施工及管理都不便。一般把排沙孔设在进水口的侧下方,其位置以使进水口处在冲刷漏斗的影响范围之内为原则。低水头枢纽的防沙措施,主要是进行合理的平面布置。如利用弯道环流特性,正面取水,侧面排沙,同时设置导沙坎,常能取得较好的防沙效果。在中小型水库中,也可采取清浑水分治的办法,即在童水区上游修建排浑渠(或排浑洞),当汛期洪水人库时,可将浑水通过排浑渠(洞)直接排往坝下游,减少主库淤积,缓解坝区泥沙问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条