说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 淤积河
1)  aggrading river
淤积河
2)  channel deposition
河道淤积
3)  river channel sedimentation
河道淤积
1.
Analysis and study has been carried out in this paper on several problems such as the river channel sedimentation harnessing scheme,the comparison and selection of gate locations,the structural type and construction method of the tidal gate and the sedimentation releasing and de silting measures applied to gate surround.
针对永定新河治理工程设计中涉及到的河道淤积治理方案、闸位比选、防潮闸结构型式及施工方法、闸下减淤清淤措施等诸多问题进行了分析和研究 ,提出了相应的措施和建
4)  estuary sedimentation
河口淤积
5)  Silted channel
淤积河道
6)  riverbed deposit
河床淤积
1.
Procedure of riverbed deposit,character of water current and wave analyzed and predicted after TGP reservoir filling,whichare the base of bank slope rebuilding study.
对三峡库区奉节河段蓄水后的河床淤积过程、水流及波浪特点进行了分析预测,为库岸稳定性分析奠定了基础;分析了岸被冲刷塌岸模式及预测方法;并对典型滑坡的力学稳定性作了预测分析。
补充资料:坝区泥沙淤积


坝区泥沙淤积
sedimentation in dam area

boqLJ rl}sho ytljl坝区泥沙淤积(Sedimentation in dam area)河流上筑坝塑水后,由于塑水区内水深加大,流速降低,泥沙沿程淤积,并向坝前推进,造成坝前泥沙的淤积。坝区泥沙淤积产生的问题主要有:①在船闸引航道中及其口门附近产生淤积,使航深不足或水流不顺而有碍通航。②电站进水口前的泥沙堆积使过机水流中的含沙量增大,泥沙变粗,造成过水建筑物或水轮机过流部件的严重磨损。③坝前泥沙淤积有可能影响问门启闭,堵塞泄水孔,影响大坝安全。 以通航为主的枢纽和以发电为主的枢纽对坝区水流条件的要求不同,防治坝区泥沙淤积的措施也不一样。 (1)以通航为主的枢纽。宜将船闸布置在靠近稳定深乱线一侧,要避开弯道的凸岸和回流、缓流区。这些地区都是泥沙集中淤积处,且淤积后又难于冲走。结合各个工程的实际情况,可设置某些导流排沙工程,如修建引航导墙以破除回流减少淤积;设置底部高程较低的冲沙闸,以定期冲刷上游及下游引航道淤沙。 (2)以发电为主的枢纽。高水头水电站的防沙措施主要是设置高程较低的排沙孔。排沙孔布置在机组进水口的下面,防沙效果最好,但结构复杂,施工及管理都不便。一般把排沙孔设在进水口的侧下方,其位置以使进水口处在冲刷漏斗的影响范围之内为原则。低水头枢纽的防沙措施,主要是进行合理的平面布置。如利用弯道环流特性,正面取水,侧面排沙,同时设置导沙坎,常能取得较好的防沙效果。在中小型水库中,也可采取清浑水分治的办法,即在童水区上游修建排浑渠(或排浑洞),当汛期洪水人库时,可将浑水通过排浑渠(洞)直接排往坝下游,减少主库淤积,缓解坝区泥沙问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条