说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 营养阶段
1)  vegetative stage
营养阶段
2)  staged nutritional support
阶段性营养支持
1.
It reviewed the staging of course of disease, the purpose and methods of nutritional support, and the new progress on staged nutritional support for severe acute pancreatitis patients.
从重症急性胰腺炎的病程分期、营养支持的目的、营养支持的方式及阶段性营养支持治疗方面对重症急性胰腺炎病人的阶段性营养支持治疗进展作一综述。
3)  vegetative growth phase
营养生长阶段
4)  grading supporting of metabolizingnutrition
分阶段代谢营养支持
5)  service stage
运营阶段
1.
This paper analyzes the Siduhe Rive Suspension Bridge of Shanghai-Chengdu Expressway in construction stage and service stage with nonlinear finite element method and compares the results of nonlinear analysis with those of linear analysis.
采用非线性有限元方法对沪蓉西第十六合同段四渡河特大悬索桥进行施工阶段和运营阶段分析,并详细比较了运营阶段分别采用线性分析方法和非线性分析方法得到的结果,得出一些可供工程设计参考的结论。
6)  Operation Stage
运营阶段
1.
The temperature effect analysis of cable stayed bridge operation stage
斜拉桥运营阶段温度效应分析
2.
The Static characteristic in operation stage is analyzed, and structural behavior and its characteristic of the bridge are researched, including the transverse intensity and the twist performance.
论文首先论述了国内外钢管及钢管混凝土组合结构在桥梁工程中的应用,针对梁式结构,探讨通过钢管及钢管混凝土组合结构来减小结构自重,提高跨越能力的技术方法以干海子大桥设计方案为工程背景,运用大型有限元软件MIDSA/CIVIL2006建立完整、详细的全桥空间组合有限元模型,对其运营阶段进行静力分析,探讨结构的实际受力行为和特点,分析主梁刚度是否满足设计要求;对全桥自振特性进行计算,用反应谱法对结构地震响应进行计算分析;最后根据上述分析结果评价干海子桥的静动力学行为,归纳总结轻型化钢管混凝土梁式桥梁结构的静动力行为的一般规律。
补充资料:锌营养不良性营养期延迟


锌营养不良性营养期延迟


病名。锌营养 缺乏引起的青春期延迟,在动物蛋白摄入不足的国家和地区相当多见,除性发育不全外,常 伴 有矮小及食欲不良等症状,伴有低锌生化指标,如及时改善锌营养,则可促进发育。 
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条