1) weir loading
堰流负荷
2) weir loading
堰口负荷
1.
Its weir loading is decreased gradually with the decanting of water.
研究表明,浮动式滗水器结构简单可靠、运行稳定、滗水深度大、适用范围广,其堰口负荷随着滗水的进行而逐渐减小,与SBR工艺匹配较好,既保证了出水水质,又具有较大的滗水能力。
3) loading of effluent weir
出水堰负荷
4) load current
负荷电流
1.
State estimation method of distribution network based on load current takes load current as state variable, the branch measurement function is represented with load current, and the state estimation value of branch current can be obtained, which reduces the solution space of state estimation problem and raises the convergence of algorithm and calculation speed.
基于负荷电流的配电网状态估计方法以负荷电流为状态变量,将支路测量函数用负荷电流表示,利用三相潮流计算方法得到支路电流的状态估计值,从而降低了状态估计问题的求解空间,提高了算法的收敛性和计算速度,通过将该算法与三相潮流计算法比较,结果表明状态估计算法在效果、速度、收敛性方面都较常规方法优越。
2.
The reliability and sensitivity of the present adaptive current protection is dropped under phase-to-phase fault due to the existence of load current in non-valid grounded power systems.
针对配电网电流保护的特点,提出了一种彻底消除配电网中负荷电流对保护灵敏度影响的算法,根据存在负荷电流的情况建立动作判据,将考虑负荷电流影响时的两相短路电流归算为同一点三相短路电流,然后再与定值作比较,从而克服了目前的电流保护普遍存在的由于受负荷电流的影响而使保护在两相故障时灵敏度降低的缺陷。
3.
Here introducing the way that when the bus energral to use the load current to simulate the busbar fault so as to check the problem of circuit and to correct and solve it.
介绍了在母线不停电情况下,利用负荷电流模拟母线故障检查保护回路存在的问题。
5) direct capacity
直流负荷
6) wierload
越流负荷
补充资料:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃
【诗文】:
贪看西南一面山,不知信步到陈湾。
未言散释经旬病,且要消磨半日闲。
蔬陇过寒常郁郁,鸟声迎暖已关关。
斜阳不为行人驻,十里钟来翠霭间。
【注释】:
【注释】:原题:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃归
【出处】:
贪看西南一面山,不知信步到陈湾。
未言散释经旬病,且要消磨半日闲。
蔬陇过寒常郁郁,鸟声迎暖已关关。
斜阳不为行人驻,十里钟来翠霭间。
【注释】:
【注释】:原题:肩舆历湖桑堰东西过陈湾至陈让堰小市抵暮乃归
【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条