1) correction chart
校正图表
2) capillarity-correction chart
毛细误差校正图表
3) corrective word list
校正词表
1.
The proposed processing technique consists of the basic word list, the corrective word list and the rules, and they are interactive.
本文对收集到的CSAS逐个进行了研究,提出了“人脑认定+语料库验证”的提取方法以及基本词表、校正词表和规则库互动的处理手段,其中不相邻条件匹配的越过规则可解决统计方法难以解决的问题。
4) instrument correction
仪表校正
5) near-surface correction
表层校正
6) correction chart
校正图版
1.
Included angles between hole - axes and bed boundaries are different in deviated wells and the measuring devices operate in eccentric positions, thus the influences of surrounding rocks on the measurements are different with that in vertical wells and the old correction charts are no longer applicable.
在斜井中井轴与地层界面具有不同的夹角,仪器是偏心测量,围岩对测量值的影响与垂直井不同,以往的校正图版已不适用。
2.
The correction chart is made based on theory calculation or experime.
校正图版是根据理论计算或实验结果做出的,不适合于逐点对所有井段的地层进行较全面的环境影响校正。
补充资料:放矿计划图表
放矿计划图表
chart of ore drawing
fong伙旧ng]lhuo tub旧。放矿计划图表(ehart of ore drawing)在崩落岩石覆盖下放矿时,根据选定的放矿制度和尽量提高矿块出矿强度等要求编制规定各漏斗放矿先后、时间和数量的计划图表。放矿计划图表应表明在什么时间、从哪些漏斗分别放出多少矿石和岩石。 采用依次放矿的放矿制度时,可以根据物理模拟放矿结果编制放矿计划图表。因为在这种放矿制度中,从各个漏斗放矿的次序已经确定;在某一时间某一漏斗的一份放出中的矿石量和岩石量是多少,也能通过物理模拟放矿加以确定但用随机模拟放矿去编制该放矿计划图表、则更为准确。对用削高峰的放矿制度时,漏斗间放矿的顺序取决于高峰落在哪个漏斗上面物理模拟放矿过程中无法知道高峰落在哪个漏斗上面,靠估算则精度又太低;简易的办法是进行随机模拟放矿在随机模拟放矿中,按不断削高峰原则确定的各漏斗放矿的次序仍然是依次的,矿块的出矿强度太低为了提高矿块的出矿强度,应尽量增多同时放矿的漏斗.但应满足下列要求:(l)在同一条电耙巷道中不同时从两个以上的漏斗放矿,以免无法记录从每个漏斗放出量。(2)对于同时放矿的两个以上的漏斗,个漏斗放矿不应导致另外漏斗轴线上的崩落矿岩接触点下移.以保证崩落矿岩接触面尽量按要求下降。满足这两项要求的方法是,轮到从某漏斗放矿时,就把从该漏斗放矿的日期排在已排过的最后一天,然后看是否满足这两项要求。如果能满足,则往前挪一天;如果不能满足,则把这个日期排在最后一天的后面这样编制的放矿计划图表,就是放完该矿块的通盘计划图表。执行这种放矿计划图表时,还应逐日累计从每个漏斗放出的矿岩量,通过多退少补,使实际的累计量靠拢计划值 (苏宏志)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条