1) chamber height
炭化室高度
2) coal line
炭化室的煤料高度
3) chamber width
炭化室宽度
4) length between door plugs
炭化室有效长度
5) coking chamber
炭化室
1.
In order to solve the problem of over-campaign service of No1 coke oven,the falling off of cover top brick at combustion chamber of flues 1-4 at the machine side of coking chamber and the big resistance of pushing on coke,the author adopts local patch and repair technology for north and south walls at the machine side of the coking chamber.
针对1#焦炉超龄服役,炭化室机侧1-4火道燃烧室盖顶砖脱落、推焦阻力大等现状,采用局部挖补技术对炭化室机侧南北墙进行修复,介绍了修复措施和实施方案。
6) wide oven chamber
宽炭化室
补充资料:焦炉炭化室墙的火焰焊补
焦炉炭化室墙的火焰焊补
5矿。焦炉炭化窒墙蜘火嬲埠补
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条