1) shoulder punch
台阶式凸模
2) Pedestal System
台阶模式
1.
Study and Implementation of BESIII EMC Pedestal System
BESIII EMC台阶模式的研究与实现
3) ladder-shape punch
阶梯式凸模
1.
Introduced design method and points of separation combined extruding die with ladder-shape punch in extruding die, stated extruding die design process and thought using practical example.
介绍了挤压型材模具中,具有阶梯式凸模的分流组合模设计的方法和设计要点,用实例阐述了该类型模具的设计过程和设计思路。
4) step-flow mode
台阶流模式
5) step punch
阶梯凸模
1.
Using bevelled punch and step punch in blanking die, carried on the rational distribution to blanking force, reduced the blanking force well which the press equipment need, and the question of insufficient press equipment pressure was solved.
在冲裁模中结合使用斜刃凸模和阶梯凸模,对冲裁力进行合理分配,很好地降低了冲压设备所需的冲裁力,解决冲压设备压力不足的问题。
6) mold convexity
模具凸台
1.
This paper at the base of introducing the structure of KBE system and its key technologies,intelligent parametric design for mold convexity is established by the KF module in the UG,which is three-dimensional module software.
本文在介绍了KBE系统构成及其关键技术的基础上,在三维建模软件UG提供的知识熔接(KF)模块平台上建立了模具凸台智能参数化设计。
补充资料:带浮动凸模的拉伸、落料及冲孔复合模
对于拉伸件, 人们习惯于将板料预先剪裁或冲裁到一定形状后,再进行拉伸。对于有不规则法兰的凸缘拉伸件, 拉伸后必须增加切边工序才能保证工件的外形, 如果工件有平面度要求,还要增加整形工序,这就增加了工序数量。因工序数量多造成的定位误差,可能影响到产品的质量, 而且这种设计方法也不能避免手进入冲模危险区域内,不安全。
1 工艺分析
2 模具结构及工作过程
3 聚氨酯橡胶块的设计
在设计聚氨酯橡胶块外形尺寸时, 先初选预压缩量ε1 = 5 % , 终压缩量ε2 = 20 % , 然后计算橡胶高度, 再根据橡胶厂提供的有关图表和数据,计算橡胶的压缩力,最后与工件的成形力比较,如果两者不是很接近,再重选ε1 和ε2 ,直到两者相近为止。
严格来讲, 工件成形力和橡胶压缩力的计算都不是太精确,实际应用时,还需在计算基础上通过调整橡胶高度来调整橡胶的压缩力。
同时,聚氨酯橡胶组织细密,内部没有气泡和空隙, 可以认为其体积不可压缩, 因此,聚氨酯橡胶块的安放空间要根据体积不变的原则来计算。
4 凸凹模设计
工件浅圆锥台成形时, 该处材料在切向和径向均受拉应力,使工件紧贴凸模成形,而凹模部分只参与圆角R3mm的成形。故可将凸凹模成形部位的形状简化,如图3 所示。这样既不影响成形, 又有利于成形时的金属流动,降低了成形力,也提高了凸凹模的强度。
另外, 高度H设计得比浅圆锥台高4~6mm,以使凸凹模刃磨后不影响成形高度。
5 其它关键零件
拉伸凸模与固定板之间采取H7/ h6 滑动配合,固定板调质处理。拉伸压边力由4 个螺堵调节, 压料块5 及凸凹模10 工作表面粗糙度值要求低,以避免在工件表面留下压痕。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条