说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 顺序制
1)  sequential system
顺序制
2)  Sequence control
顺序控制
1.
The realization of band conveyor's sequence control system;
带式输送机送料顺序控制系统软硬件的实现
2.
The design of sequence control subsystem of the medium and thick steel plate's computer control system;
中厚钢板计算机过程控制系统顺序控制子系统的设计
3.
The design and disquisition of the sequence control procedures based on ZEN;
基于ZEN的顺序控制程序设计研究
3)  sequential control
顺序控制
1.
Application of EDA Technology in Sequential Control;
EDA技术在顺序控制中的应用
2.
Application of SFC in redacting ladder diagram of sequential control;
PLC的SFC图在编写顺序控制梯形图中的应用
3.
Configuration design of sequential control for PSA decarburizing unit;
PSA脱碳装置顺序控制的组态设计
4)  order control
顺序控制
5)  drawing order
绘制顺序
1.
This paper analyzes the transport network elements in topography databases andpresents an automatic drawing method for transport network elements based on composinggraphical elements and setting graphical elements’drawing order,which can provide an optionalapproach for transport network elements’automatic drawing.
分析了地形数据库中交通网要素数据,提出了一种基于图元组合并设置图元绘制顺序的交通网要素自动绘制方法,为解决交通网要素的自动绘制提供了一种可选途径。
6)  rolling sequence
轧制顺序
1.
The previous management mode and information systematic implementation of rolling sequence used for production units in the 1420/1550 Cold Rolling Plant of Baoshan Iron and Steel Co.
阐述了宝钢股份公司1420/1550冷轧生产中原有的机组轧制顺序的管理模式和计算机系统的具体实现。
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条