1) storage capacity
水库容量
2) dead storage
死库容拦水量
1.
Some factors of water consumption on the proceeding of sediment-storage dam construction, such as water consumption in silt proceeding,water consumption of evaporation and dead storage of the sediment-storage dam,were studied.
通过对陕北地区淤地坝建设的淤地过程耗水量、蒸发损失量、死库容拦水量等耗水因素计算分析,得出陕北地区淤地坝建设将耗用黄河水资源最大不超过10亿m3,继而通过比例分析认定该水量仅占项目区水资源总量78。
3) calculation of reservoir capacity
水库容量计算
4) reservoir live storage
水库有效容量
5) reservoir capacity
水库库容
1.
The analysis method, the new method calculating reservoir capacity, is put forward on the basis of topographic map, without area meter and no reservoir cross-section.
提出一种不必使用求积仪量算面积,无须绘制横断面图,直接在大比例尺地形图上,量取横断面上特征点(反映在地形图上)的有关数据,用解析法计算横断面面积,从而计算水库库容的新方法———解析法。
6) Capacity
[英][kə'pæsəti] [美][kə'pæsətɪ]
库容量
1.
The results show that canopy capacity at young-tree stage,fast-growth stage,timber stage and mature stage of Chinese Fir Plantation was 0.
以裸露地为对照,以福建省杉木人工林地上的“绿色水库”和地下的“土壤水库”为研究对象,结果表明:杉木人工林林冠层、林下植被层、枯枝落叶层的“库容量”在不同生长阶段分别为幼树阶段0。
补充资料:水库调节防凌(见水库调度)
水库调节防凌(见水库调度)
shuiku tiaoiie fangling水库调节防凌见水库调度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条