1) time-cost trade-off
时间费用权衡
2) time/cost trade-offs
时间-费用权衡
1.
In the project management,the project s duration can often be compressed by accelerating some of its activities at an additional expense,this is the so-called time/cost trade-offs problem(for short,TCTP),which has been studied extensively in the project scheduling literatures.
项目管理中,通过增加额外费用来加速执行项目的某些活动,以此达到缩短项目工期的目的,这就是在项目调度文献中被广泛研究的时间-费用权衡问题。
3) discrete time-cost trade-offs
离散时间-费用权衡
1.
The discrete time-cost trade-offs problem(DTCTP) with bi_criteria optimization model is a most widely concerned in project scheduling literatures,which has been studied under three possible forms: 1)P1: the deadline problem.
离散时间-费用权衡问题(DTCTP)是项目进度文献中被研究最多的双目标优化问题,它通常以三种形式出现:1)P1:截止日期问题;2)P2:预算问题;3)P3:工期-费用曲线问题。
2.
The discrete time-cost trade-offs problem(DTCTP,for short) is a most widely concerned with bi-criteria optimization model in project scheduling literatures,which has been studied under three possible objectives.
离散时间-费用权衡问题(DTCTP)是项目进度中研究最多的双目标优化问题,它通常以三种形式出现:(1)P1:截止日期问题,在项目截止日期约束下使完成项目的总费用最小;(2)P2:预算问题,在费用预算约束下使项目工期最短;(3)P3:工期-费用曲线问题,找出全部有效的工期-费用模式集合。
4) time-cost tradeoff problem
时间-费用权衡问题
1.
The research on time-cost tradeoff problem started from the early 1960s and the relative scope has expanded a lot in the following decades.
对时间-费用权衡问题的研究始于上世纪六十年代初,并且所涉及的范围在随后的几十年中大为扩展,但在问题的解决上却一直未取得突破性进展,最主要的瓶颈就是解决该类问题时所遇到的高复杂度和大计算量。
5) Time trade-off
时间权衡法
6) time/cost trade off
时间/成本权衡
补充资料:保险的费用(含施救费用与救助费用)
保险的费用(含施救费用与救助费用)
保险的费用(含施救费用与救助费用)保险人即保险公司承保的费用。即当保险标的物遭遇保险责任范围内的事故时,除了能使货物本身受到损毁导致经济损失外,还会产生费用方面的损失,这种费用保险人也给予赔偿。 可保险的费用主要有以下几种:①施救费用。指在国际货物运输保险中,发生承保责任内的事故或自然灾害,被保险人或者他的代理人、雇用人员为防止损失扩大而进行抢救行为所支出的合理费用。保险人对这种施救费用,负责赔偿,以鼓励被保险人对货物积极抢救。②救助费用。保险标的物发生承保责任范围内的自然灾害或意外事故,由保险人和被保险人以外的第三者来解救危险,获救方应该向救助方支付相应的费用,这种费用就是救助费用。它属于共同海损的费用支出。③特别费用。指运输工具遭遇海难后,在避难港由于卸货所引起的损失,以及在中途港、避难港由于卸货、存仓及运送货物所产生的费用。这种费用也属于保险人赔付范囿。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条