1) time limit target for construction
施工工期指标
2) Construction index
施工指标
3) construction period
施工工期
1.
Measures to reduce construction period;
如何合理缩短工程施工工期
2.
Study on construction period risk of jiao-jiang bridge;
椒江口大桥施工工期的风险研究
3.
Determine the construction period for complex mountain railway in design phase
复杂山区铁路设计阶段施工工期确定
4) constructing skill index
施工技术指标
1.
Combined with the general conditions of project and after analyzing and comparison of load-reducing plans,decision is made by using gas saturated concrete soft soil as partial load-reducing back-fill material,discusses its features,constructing skill index,constructing quality control and product protection.
结合工程概况,经过减荷方案的分析比选,决定采用气泡混合轻质土作为局部减荷回填材料,并对其特性、施工技术指标及其施工质量控制、成品保护等方面进行了论述,工程实践表明,气泡混合轻质土的成功应用,圆满地解决了地下通道回填的安全性和经济性问题。
5) index of construction quality
施工质量指标
6) Construction performance standard
施工性能指标
补充资料:施工工期
见建设工期。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条