说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 入口水
1)  inlet water
入口水
2)  water inlet
入水口
1.
Based on the comprehensive survey of the dangerous piping condition in Hongzehu Lake levee at 52K+315, Jiangsu Province, the detailed surveying work was done to find the water inlet of piping with the flow field fitting method and its corresponding instrument (DB-3 detector of the dam piping and leakage).
在综合考察江苏省洪泽湖大堤 5 2K +3 1 5附近管涌险情的基础上 ,用流场拟合法和相应的仪器 (DB-3普及型堤坝管涌渗漏检测仪 )对该管涌渗漏的入水口进行了较详细探测。
2.
Based on the similarity between the water flow field and electric current field, a new method called flow field fitting method which is used to detect the water inlet of the seepage and piping is put forward.
堤防管涌渗漏是危害堤防安全运行的主要原因之一,本文根据水流场与电流场在一定条件下的相似性,提出一种新的探测管涌渗漏入水口部位的流场法,这种方法通过测量水中电流密度场分布来确定管涌渗漏入水口部位,模拟实验表明流场法能够较为准确的探查出管涌渗漏的入水口,并且当探测区域存在金属干扰物时并不影响到渗漏的探测和解释,是一种有效的管涌渗漏探测方法。
3)  source water level
入口水位
1.
Starting with the adjustment theory on speed change of centrifugal pump, the relation between revolving speed of the centrifugal pump and source water level as the source water level changes has been discussed in order to maintain the water flux constant by speed change adjustment the calculation method to fine the relation and energy saving analysis.
从离心泵变速调节原理入手 ,探讨了当泵站入口水位发生变化时 ,以维持泵系统流量不变为目的所确立的水位与泵转速对应关系的计算方法及能耗分
4)  feed-water intake
给水入口
5)  drainage inlet
排水入口
6)  inlet water qty
入口水量
1.
Key links such as mill\'s feed qty control,mill\'s inlet water qty control and mill\'s grinding density of the system are explained in details.
介绍了鞍钢调军台选矿厂磨磁自动控制方案,并针对该系统中球磨机给矿量控制、入口水量控制及磨矿浓度控制等关键技术进行了详细说明。
补充资料:地下水水资源评价(见水资源评价)


地下水水资源评价(见水资源评价)


  d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条