1) daily peakshaving,diurnal peak shaving
日调峰
2) peak clipping
削峰,调峰
3) peak-shaving
调峰
1.
Application of LNG in peak-shaving of city gas pipeline network
LNG在苏州城市管网供气调峰中的应用
2.
According to the present pipeline condition, the paper proposed some peak-shaving techniques, like the tail .
针对西气东输天然气管道供气用户多、用户类型不同、供气量峰谷变化大等造成管线运行不平稳的突出矛盾,分析了城市用户、工业用户、电厂用户等不同类型用户的用气峰谷变化规律及对管道平稳运行的影响;根据管道现有条件,提出了利用管段末端储气解决日调峰、全线储气解决周调峰、气田调控和储气库解决季节调峰等调峰技术措施,并对联络线调峰方式进行了探讨;同时针对现有储气库设计,提出改进储气库调峰功能的技术建议,尤其要从设备选型上满足储气库解决各类调峰问题的能力。
3.
In order to recover the pressure energy generated in the natural gas pipeline networks and to meet the demand of urban natural gas peak-shaving, LNG peak-shaving proposal was advanced to recover pressure energy of gas transmission pipeline networks.
为了回收天然气管网蕴含的巨大压力能,且同时满足城市燃气调峰的需要,提出了回收输气管网压力能的天然气液化调峰方案。
4) peak shaving
调峰
1.
One of the major applications of a simulation software for gas pipeline operation is peak shaving of gas supply system.
供气调峰过程是输气管道运行仿真软件的主要应用对象之一。
2.
Based on the West-to-East Gas Pipeline's operation in 2008,the research on short-term peak shaving is carried out.
利用输气管道模拟软件(TGNET)研究了2008年西气东输管道的短期调峰问题。
3.
Through comparing the characteristic of different gas storage facilities, the paper proves that the construction of underground natural gas storage is the most effective action to solve the problem of peak shaving and ensure uninterrupted gas supply fundamentality.
对各种储气调峰设施的特点进行了比较 ,结合我国天然气管道工程 ,根据计算结果 ,说明建设地下储气库是从根本上解决调峰和保证不间断供气的最有效措施。
5) peak regulation
调峰
1.
With the fast increasing of power desire in Guangxi province and the enlarging of the load peak and off-peak difference,system needs peak regulation capacity urgently.
随着广西电网电力需求迅速增长,负荷峰谷差日益扩大,系统迫切需要调峰容量。
2.
The main problems of peak regulation in northeast power gird were analyzed.
分析东北电网目前调峰存在的主要问题。
3.
Taking the peak regulation of hydropower systems into account, a long-term optimization model of the maximum peak regulation expectation for the Jinshajiang cascade hydropower stations is set up.
以金沙江干流梯级水电站水库群为研究对象,建立了金沙江梯级水电站水库群兼顾保证出力要求的以发电量最大为目标的长期优化调度模型;考虑水电系统的调峰要求,建立了金沙江梯级发电量最大长期优化调度模型。
6) peak-load regulation
调峰
1.
From aspects of the capability demand for peak-load regulation of Shaanxi Power Grid,governing the Yellow River and Weihe River,governmental targets of energy,conservation and waste reduction,the economic development of Shaanxi,the suggestions to build Qikou,Guxian and Ganzepo cascade hydropower stations are proposed.
从提高陕西电网水电调峰能力的需求出发,从治理黄河、渭河的角度出发,从政府的节能减排目标出发,从陕西经济的发展出发,提出了加快建设碛口、古贤、甘泽坡3个梯级水电站的建议。
2.
Due to the tendency that large-scale nuclear power plants plays an increasing important role in grids of China,the condition of large-scale pressurized water reactors(PWRs)participating in peak-load regulation of grid is reviewed.
针对未来我国大型核电装机比重在区域电网日益增长的趋势,介绍了我国与国外大容量压水堆核电机组参与电网调峰的现状,分析了它们参与中间负荷调峰的必要性;通过分析商用压水堆设计特性、核汽轮机工作特性指出了机组进行日中间负荷调峰的可行性,推荐了日负荷跟踪出力曲线;指出压水堆在局部功率峰、慢速调节硼酸浓度、氙钐等毒物的瞬态、堆芯寿期末的碘坑、燃料芯块与包壳的相互作用等方面,制约着机组调峰的安全性和灵活性,在此基础上深入探讨机组适应日负荷跟踪调峰运行需具备的技术条件;以大亚湾M310型机组为例,通过分析其负荷变动时稳态和瞬态下主系统和设备的工况变化,指出调峰运行对电站核安全、可靠性的负面影响有限,对经济性的降低较明显;以第三代先进压水堆为例,提出了机组适应调峰运行需努力的技术方向。
3.
The main purposes of developing PSPS is to solve the issues of peak-load regulation and eco-nomical operation of power system.
本文对抽水蓄能电站在电网中的作用和效益进行了分析,认为当前发展抽水蓄能电站主要是解决电网调峰和经济运行的问题,而经济运行问题逐步成为决定的主要因数,建设抽水蓄能电站取得的经济效益如何合理分配,是发展抽水蓄能电站的关键。
补充资料:电力系统调峰
电力系统调峰
peak load following of electric power system
d一onl一x}tongt一oofeng电力系统调峰(peak load following of eleetriepowersystem)为满足电力系统日尖峰负荷铸要,对发电机组出力所进行的调整。 尖峰负荷是由于一日24小时内用电需求不均匀而形成的。一般一昼夜之内,在上午和照明时间,出现两次尖峰负荷,深夜则为用电最少的低谷负荷(仅为尖峰负荷的5。%~70%)时间。尖峰负荷持续时间相对较短。 尖峰负荷与低谷负荷的差值很大,因此要求有些发电机组在低谷负荷时停机,而在尖峰负荷到来之前迅速起动并增长出力,尖峰过后即降低出力和停机(见图)。这些机组称为尖峰负荷机组或调峰机组。它们具有起动时间短、出力变化快和可以频繁起停的性能。 必须在电力系统发展规划中列入调峰措施,决定选用机组类别,根据系统运行需要对其建成进度妥善安排。具体措施有:①采用水电机组调峰。②采用抽水抽水留能机组所发电力黔乡茱 的次。租峨喇钧份一舰尖峰负祠机组所发电力抽水公能御幽拍水中间负蔺机组所发电力,一一一一一一一一一一、、、___,羞本负蔺机组所发电力12 16幼24 时序,时 调峰示意图蓄能机组调峰,低谷负荷时抽水,尖峰负荷时发电。此措施具有显著的调峰效益。③采用专门调峰的火电机组。①对已装常规火电机组进行改进,使之降低最低允许出力或能每日开停而实行两班制运行等,以减轻尖峰负荷和低谷负荷差值大所引起的调峰困难。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条