1)  adit for draining
排水坑道
2)  water drainage
排水
1.
Application of mine stand pump to mine water drainage in coal mining face of Jining No.3 Mine;
矿用立泵在济三煤矿工作面排水中的应用
2.
Hollow concrete is a well performance novel road base material,and the corresponding asphalt pavement with hollow concrete water drainage substrate is a novel road pavement structure.
多孔混凝土是一种性能良好的新型道路基层材料,相应的多孔混凝土排水基层沥青路面是一种新型的路面结构。
3.
The significance, task and three means of water drainage on cloverleaf-junction drainage are introduced.
介绍了立交排水的重要性、任务及立交排水三种方式,阐述了立交排水量的计算和设计原则。
3)  drainage
排水
1.
The drainage, water intake and water conservation of paper industry;
造纸工业的排水、取水和节水
2.
Improvement of Relayed Drainage System of Large Scale Mine Submerge Motor Pump;
大型矿用潜水电泵接力排水系统的改进
3.
Scheme design of vertical shaft drainage system during shaft construction;
建井期立井排水系统方案设计
4)  draining water
排水
1.
This article elaborated the "inductive jet" principle of air current and the application in draining water accumulated in the factory,explained the feasibility and practicability of using vacuum absorption as the power supply to drain water automatically in the enterprise.
从实际应用的角度出发,阐述了气流“引射”原理及其在工厂排除积水中的应用,说明了利用真空吸附为动力源在企业中进行自动排水的可行性和实用性。
2.
After many times argumentation and schemes choosing,we decided to pave an open channel to draining water in the footing groove to accel- erate the pump speed and ensure the displacement for increasing the excavating tempo.
南水北调中线瀑河渠道倒虹吸工程地处地质构造复杂、节理裂隙发育、地下水极为丰富地带,排降水成为影响工程进度的一个主要难题,从多种排水和降水方案中,经多次论证,确定基坑内设明沟排水,加快抽水速度,保证排水量,以提高开挖进度。
5)  drain
排水
1.
Feasibility study of coal yard drainage reuse in power plant;
火电厂煤场排水循环利用可行性研究
2.
The main points about the design of the automatic drains in the FanGezhuang mine of the KaiLuan Group;
开滦集团范各庄矿自动化排水设计
3.
We have researched on the central drain system and the builtin fire foam delivery system and began domestic application for large floating roof storage tank by comparing the application of the system both domestically and internationally.
通过对比国内外大型浮顶贮罐中央排水消防系统的应用 ,开展了国内的研制与应用 ,该技术的推广和应用将促进国内大型贮罐的建
6)  Water Drain
排水
1.
The design optimum of municipal water drain checking well;
市政排水检查井设计优化
2.
The quality control of polyethylene tube in town water drain construction;
聚乙烯管道在城镇排水施工中的质量控制
参考词条
补充资料:坑探勘探坑道通风排水
      坑道掘进中,通风与排水是确保安全生产和正常施工的必要工序。二者的工作介质均是流体(空气和水)。
  
  坑探通风  不断从勘探坑道排除各种有毒、有害气体及粉尘,并输入新鲜空气,调节坑内气温和湿度,以创造良好的工作环境。按规定向坑道供给的新鲜风量平均每人不得低于4立方米/分,进风流中按体积计的氧含量不得低于 20%,二氧化碳含量不得超过0.5%。此外,对坑道内的空气成分、风速、温度和湿度均有相应规定。勘探坑道一般只有一个通向地面的出口,因此,主要的通风方法是采用提高通风机的空气压力和速度,利用风筒形成风流的流通回路。通风方法一般有 3种方式:①压入式,用通风机将新鲜空气经风筒输送到工作面,污浊空气沿坑道排出;②抽出式,用通风机将工作面的污浊空气经风筒吸出,新鲜空气沿坑道输送到工作面;③混合式,将压入式和抽出式共同使用,可利用压入式通风风流有效射程大和抽出式通风不污染坑道的优点(图1)。在多分支勘探坑道中采用风筒并联压入式(图2)或风筒并联混合式通风(图3)。坑探通风用的风筒,采用直径300~500毫米的刚性(铁皮、塑料)或柔性(橡胶面、玻璃纤维)风筒。通风机有离心式、轴流式和双电机对旋轴流式。
  
  
  坑探排水  在掘进坑道时,不断排除涌出的地下水,地下水的涌出不仅恶化了掘进工作条件,还可能造成淹没事故。水平坑道中采用水沟排水,水沟沿坑道自工作面向出口的坡度是3~7%。倾斜和垂直坑道多采用水泵、吊桶排水,常用的方法有:①潜水泵-吊桶排水。当工作面涌水量小于4立方米/分时,在装岩的同时用潜水泵将工作面的积水排入吊桶并随岩石一起提到地面(图4);当排水高度不大时,也可用潜水泵通过排水管直接排到地面。②吊泵排水。吊泵与排水管用钢丝绳共同悬吊在井架上,根据需要可随时提上或下放(图5)。③卧式离心泵排水。水泵安置在特制的平车上,可以沿轨道升降以便爆破前后提放水泵(图6)。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。