2) creepage current
爬电电流
3) creepage length
爬距,爬电长度
4) creepage distance
爬电距离
1.
Determination of the minimum clearance and minimum creepage distance for electronic equipment in safety examinations;
电子产品检测中电气间隙和爬电距离的确定
2.
The determination method of electrical clearance and creepage distance is expounded, and the testing and demonstration method is described.
阐述了电气间隙和爬电距离的确定方法,并介绍了试验验证方法。
3.
Calculation and numerical analysis from programming educesaccurate measurement of creepage distance in complicated structure, thereby strengthening the proficiency test ability.
爬电距离是安全试验和国内外水平测试的重要项目。
5) electric-controlled raise scaffold
电动爬架
1.
Analysis construction technology of large integral climbing formwork with electric-controlled raise scaffold;
电动爬架整体提升大模板施工技术分析
6) electric driven climbing formwork
电动爬模
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。