1) visual test
目测试验
2) test system of target detection
目标探测试验系统
3) visual colour grading
目测比色分级试验
4) test project
试验项目
1.
The mutual influence and reasonable order of environmental test projects were analyzed,and general principles were expatiated when the order of environmental test project was selected.
首先介绍了产品进行环境试验的目的及其重要性,对环境试验项目之间的相互影响及合理顺序进行了分析,并阐述了选择环境试验项目顺序所遵循的一般原则,说明在进行环境试验时,必须针对具体试验项目,注意合理的试验顺序,才能确保试验结果的真实性、代表性和可比性。
2.
The fundamental requirements,working principle,analysis of main technical parameters,a brief of test project of DC 1 900 V 400 A fuse used on subway electric locomotives were presented,in order to promote design and manufacture of home made DC fuse with extra best brand and to get rid of status of depend on import pro-(duct) over a long period of time.
论述了保护地铁电力机车用的1 900 V、400 A直流熔断器的基本要求、工作原理、主要技术参数分析和试验项目简介,以推动我国自行设计、制造国产特优品牌的直流熔断器,脱离长期依赖进口产品的局面。
5) test item
试验项目
1.
The main test items includes accuracy test,simulation test,isolation test,environment test,electromagnetic compatibility test,mechanical performance test,continuous-cu.
在总结在线监测系统的应用经验和参考相关标准的基础上,首次全面提出了试验体系包括型式试验、出厂试验、交接试验、特殊试验和抽样试验,以及包括准确度试验、模拟试验、绝缘试验、环境试验、电磁兼容试验、机械性能试验、连续通电试验和可靠性试验等试验项目的具体内容和指标要求。
6) blind trial
盲目试验
补充资料:目测
1.凭眼睛测量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条