1) temporary bearing shell
临时轴瓦
2) temporary bush
临时轴衬
3) pad critical mass
轴瓦临界质量
4) bush
[英][bʊʃ] [美][buʃ]
轴瓦
1.
Discussion on technology of repairing truncation three oil wedges bush of 200MW turbine;
200MW汽轮机平切三油楔轴瓦修复技术探讨
2.
The worn surface of an Al-Sn alloy bush got from a locomotive engine after using the mineral additive was analyzed.
利用销盘式磨损试验机研究了一种矿物质润滑油添加剂对钢/铝锡合金摩擦副摩擦学性能的影响,并考察了这种添加剂对实际工况下铝锡合金轴瓦的作用效果。
3.
ammonia pump and its main parame-ters,analyzes the reasons for such respects as trip at low electric charge,leakage of mechanical seal,shaft vibration and displacing upward as well as the motor's bush being burnt,and puts forward somesolutions.
介绍离心式高压氨泵的密封和主要参数,分析使用过程中出现的低电负荷跳车、机封泄漏、轴振动和轴位移高、电机轴瓦烧坏的原因,并提出了解决对策,对尚存在和正在改进的问题作了介绍。
5) bearing shell
轴瓦
1.
Running-in wear simulation test for crankshaft journal-bearing shell of S50MC marine diesel engine
S50MC船用柴油机曲轴颈-轴瓦磨合磨损的模拟试验研究
2.
Through check and test,cause is found which brings to bearing shell temperature of feed water pump electromotor going up,and effective settlements are adoped to make operation effects to get the best state.
通过检查和试验,找出了导致某电厂给水泵电动机轴瓦温度升高现象的原因,并采取了有效的解决方案,使运行效果达到最佳状况。
3.
The paper discusses that the two typical bearing shell defect s analyses treatment in general repair on barrel-shaped steel ball mill;influencing the bearing shell motivity lubricate s safety factor;bearing shell oil film s safety operating condition is reduced by year after year,and must carry on restoring work to peak barrel bearing shell in 8-10 years.
对轴瓦膨胀间隙减少缺陷进行了分析,提出了预控措施和一套合理的现场处理方法。
6) bearing liner
轴瓦
1.
The overhigh temperature early warning and auto - stop - working protect system for bearing liner of pulverizer;
球磨机主轴轴瓦超温预警与自动停车保护系统
2.
The method of reducing failure rate for measuring bearing liner temperature in DAS system of 300MW turbine set;
降低300MW汽轮机组DAS系统轴瓦温度测点故障率
3.
The technology of N-95cleaning fluid with DJ specific additive special for bearing liner production line is introduced.
介绍了以DJ为特效添加剂的N-95型专用于轴瓦生产流水线的清洗液的工艺特点。
补充资料:关于临时建设和临时用地
临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条