1) building fund reserve
建筑基金准备
2) building coverage
建筑信贷准备金
3) benchmark building
基准建筑
1.
Numerical simulation was carried out for analyzing the nonlinear seismic responses of the controlled 20-story benchmark building,and the results were compared with those by other.
对一个受控的20层基准建筑结构进行了非线性地震反应的数值仿真分析,并与别的控制策略进行比较。
2.
We proposed a fuzzy control algorithm for reducing nonlinear seismic response of a 3-story benchmark building and established the interactive relationships between structural responses and fuzzifier factors,defuzzifier factor.
对受控的3层基准建筑结构进行了非线性地震反应的数值仿真分析,并与其它的控制策略进行比较。
6) buildings depreciation reserve
建筑折旧准备
补充资料:设备安装前的准备工作——吊装用机具的准备
设备安装前的准备工作——吊装用机具的准备 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条