说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 计划断电
1)  scheduled interruption
计划断电
2)  generation scheduling
发电计划
1.
Optimization analysis for adjusting of generation scheduling erro;
发电计划偏差校正的优化分析
2.
Long-term generation scheduling for large-scale power systems considering energy saving and emission reduction
计及节能减排要求的大规模电力系统长期发电计划的制定
3.
To meet the need of power system dispatch and operation,a security checking and optimal correction software system for daily generation scheduling is developed.
根据调度生产的实际需求,研发了日发电计划安全校核及最优调整系统,对其功能设计、关键技术等进行了阐述,并对四川省典型断面的安全校核和校正结果进行了分析,结果证明了该系统的有效性和实用性。
3)  generation schedule
发电计划
1.
Study on preliminary short-term generation schedule of cascaded hydropower plants under power market;
电力市场下的梯级水电厂短期预发电计划研究
2.
Security check and opti mal adjustment system ofgeneration scheduleis atraditional issue of dispatching regu-lation,but in East China Electricity Market ,there are manyspecial requirements for it .
发电计划安全校核及优化调整是电力调度管理方面的传统课题,华东区域电力市场运营对这一课题提出了新的要求,本文在综合考虑新的需求基础上,开发了一套针对华东区域电力市场中省(市)级调度交易中心应用的安全校核及校正系统。
3.
Equal time interval generation schedule curve is generally used for schedule generation.
目前,普遍采用等时间间隔发电计划曲线形成发电计划。
4)  generation plan
发电计划
1.
Monte carlo simulation of medium and long-term generation plan in hybrid power system based on environmental/economic dispatch;
混合系统中、长期节能调度发电计划的蒙特卡罗模拟
2.
The deviation between ultra short term-load forecast and the original generation plan is unavoidable .
超短期负荷预测结果与原有的发电计划之间难免出现偏差。
3.
The algorithms using stochastic production simulation for generation plan are developed.
给出了发电计划应用的两个实际问题的解决方案。
5)  power purchase plan
购电计划
1.
Risk assessment method for the day-ahead power purchase plan under the uncertain conditions;
不确定条件下日前购电计划的风险评估方法
6)  planning use power
计划用电
补充资料:用电人享有要求供电人因不可抗力断电的抢修的权利
用电人享有要求供电人因不可抗力断电的抢修的权利:因自然灾害等原因断电时,供电人应当按照国家有关规定及时抢修,以尽早恢复供电,供电人未及时抢修的,造成用电人损失的,应当承担损害赔偿责任。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条