1) post-filling
后填法
3) sublevel open-stope succeed by fill
分段空场嗣后充填法
1.
Based on the situation of mining operation,in combination with existing both mining processes,new mining process system that room is mined with overhand cut-and-fill stoping and pillar is mined with sublevel open-stope succeed by fill are presented.
从矿山的实际出发 ,结合新桥硫铁矿现有的两种采矿工艺 ,提出了上向分层充填法回采矿柱和分段空场嗣后充填法回采矿房新工艺的设想。
4) filling behind support
架后充填
1.
Study on mechanism of filling behind support and the control of soft country rock and tunnel deformation;
架后充填机理与软岩巷道围岩变形的控制能力研究
5) backfilling
[英]['bækfil] [美]['bæk,fɪl]
壁后充填
1.
The implementation of backfilling is an effectivemethod to improve the loading condition of support.
拱形金属支架的承载能力与其受载条件有很大关系,改善支架的受力将有利于承载能力的充分发挥,实施支架壁后充填是改善拱形支架受载状况的有效方法。
2.
For the characteristics of broken surrounding rocks located at Henan Dengcao coal mine and on the basis of analyzing large deformation,backfilling,bolting and bolt-grouting coupling support method were adopted to reinforce the roadway.
针对河南磴槽煤矿西区人行斜井围岩破碎变形严重的特点,在分析其原因的基础上提出了U型钢支架、壁后充填、锚网喷、锚注的耦合支护方式。
6) Houhai sea filling
后海填海
补充资料:法性属法为法性土
【法性属法为法性土】
谓真如法性之理,譬如虚空,遍一切处,乃是法身所证之体,即为所依之土,故名法性属法,为法性土。
谓真如法性之理,譬如虚空,遍一切处,乃是法身所证之体,即为所依之土,故名法性属法,为法性土。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条